Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 15, 2026
Renovation of an educational facility in Saratoga, California. Completed plans call for the renovation of a 37,969-square-foot, one-story above grade educational facility.
The Work of Project is defined by the Contract Documents and consists generally of the following 1. The major components of this scope of work are anticipated to be: 1)HVAC Renovations and Upgrades within the West Valley College Science and Math Building, including selective demolition of existing mechanical equipment, ductwork, piping, and related components as indicated on the Drawings and in the Specifications. 2) Installation of New Mechanical Systems, including new fan coil units, energy recovery ventilators (ERVs), exhaust and supply fans, associated ductwork, hydronic piping, controls, insulation, testing, adjusting, and balancing, as required to serve classrooms, laboratories, offices, and support spaces. 3) Laboratory Ventilation Improvements, including modifications to existing fume hood exhaust systems, make-up air systems, and interlocks to support code-compliant laboratory operations. 4) Electrical and Controls Work necessary to support new HVAC systems, including new power connections, panels, controls wiring, integration with the Building Automation System (BAS), and coordination with existing electrical infrastructure. 5) Structural and Miscellaneous Work required to support new mechanical and electrical equipment, including equipment pads, hangers, supports, penetrations, firestopping, and patching of existing finishes disturbed by the Work. 6) Fire and Life Safety Scope, including installation of rolling fire shutters and coordination with fire alarm systems, smoke control requirements, and DSA-approved fire and life safety provisions. 7) Phased Construction and Occupied Campus Coordination, with work to be performed in multiple phases to minimize disruption to ongoing campus operations. Construction phasing, sequencing, access restrictions, and work areas shall comply with Attachment B - Construction Phasing Plan, which identifies specific phase areas, anticipated sequencing, and periods of concentrated work. Work will occur on an active campus. 8) Temporary Measures and Protection, including dust control, noise control, temporary separations, utility outages, and protection of adjacent occupied spaces in accordance with campus requirements and the phasing plan. 9) Testing, Commissioning, and Closeout, including system testing, TAB, commissioning services, training, and delivery of complete record documentation, warranties, and closeout submittals. The commissioning agent will be hired by the district to support commissioning efforts. See Bid Documents Online Q&A Yes Q&A Deadline 05/06/2026 4:00 PM (PDT)
Sub-Bidding
Educational
$1,700,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
