BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

This is a service / maintenance or supply contract in Gainesville, Florida. Contact the soliciting agency for additional information.

Questions and Answers. Q1: Overhead and street views indicate a need to get the surrounding shoreline cleaned up in order to gain access to the retention pond. We have equipment for that, but the steepness of the bank would dictate the use of either a track loader or an excavator to facilitate the job. Would this bid require debris removal to a landfill A1: A tracked excavator will be necessary to preform the work required. The requirements are as follows. Removal of all vegetation in retention pond Removal of specified trees and vegetation immediately around retention pond Wet debris may be piled for removal after drying All debris will either be hauled off site or mulched on site Q2: Would we be able to leave equipment and trailers at the job site A2: Equipment can be left on site during the prefomance of contractual work. Q3: Is there any special permitting required A3: No special permitting is required on site. DOT may regulate the transportation of wet debris. Q4: What is the approximate pond size (acreage and depth) A4: 150' in diameter and 8' below surrounding grade at bottom. These are NOT actual dimensions but estimates. Q5: Are stumps required to be removed as part of tree clearing A5: Yes, stumps are to be removed. Q6: Are there any environmental restrictions or permits required for this work A6: No permits are required on site for this work to our knowledge. Q7: Is there a preferred debris disposal method (mulching on-site vs. hauling off-site) A7: No preferred method. The area is to be left tidy with no piles of debris at job completion. Q8: Are there any site access limitations we should plan for A8: No. Q9: What is the required completion timeframe for the project A9: 4 weeks from start of work. Remove vegetation from the retention pond at the USDA, ARS, Gainesville, FL location. Review the attached documents for required information. Submit quotes directly to the email Point of Contact in this solicitation.

Sub-Bidding

Conservation and Development

$10,000,000.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
74
Bidding Soon
1,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

June 22, 2026

Project location map

Multiple Locations, Gainesville, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.