Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 2, 2026 at 8:00 PM
Updated May 21, 2026
Site work and paving for a civil project in Oak Brook, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2026, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase I engineering services are required to provide for all work associated with the preparation of preliminary engineering and environmental studies for the improvement of approximately one mile of IL 83 from St. Charles Rd. to IL 64 in DuPage County. Typically, the existing roadway cross section consists of three lanes in each direction, with either raised curb or concrete barrier median and paved shoulders with concrete curb and gutter. The proposed improvement is anticipated to consist of developing and evaluating alternative intersection designs to accommodate existing and projected year 2050 travel demands. To be considered is a continuous flow intersection at the intersection of IL 83 and IL 64, and improvements to address operational deficiencies at IL 83 and St. Charles Rd. Work will include evaluation of an existing pump station at the viaduct approximately a half a mile north of St Charles Rd. A key planning tool will include a public involvement program based upon the principles of Context Sensitive Solutions. The scope will also include all related work necessary to complete a Project Report to be processed as a Categorical Exclusion. The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Reconstruction/Major Rehabilitation) Special Studies (Location Drainage) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 08 - RFQ Engineering - IL 83 from St. Charles Road to IL 64, Phase I Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$45,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
