BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a civil project in Oak Brook, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2026, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase I engineering services are required to provide for all work associated with the preparation of preliminary engineering and environmental studies for the improvement of approximately one mile of IL 83 from St. Charles Rd. to IL 64 in DuPage County. Typically, the existing roadway cross section consists of three lanes in each direction, with either raised curb or concrete barrier median and paved shoulders with concrete curb and gutter. The proposed improvement is anticipated to consist of developing and evaluating alternative intersection designs to accommodate existing and projected year 2050 travel demands. To be considered is a continuous flow intersection at the intersection of IL 83 and IL 64, and improvements to address operational deficiencies at IL 83 and St. Charles Rd. Work will include evaluation of an existing pump station at the viaduct approximately a half a mile north of St Charles Rd. A key planning tool will include a public involvement program based upon the principles of Context Sensitive Solutions. The scope will also include all related work necessary to complete a Project Report to be processed as a Categorical Exclusion. The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Reconstruction/Major Rehabilitation) Special Studies (Location Drainage) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 08 - RFQ Engineering - IL 83 from St. Charles Road to IL 64, Phase I Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$45,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
601
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2027

Project location map

IL-83, Oak Brook, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.