BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Public Building Commission of Chicago is soliciting Bids from General Contractors (including firms proposing to have a controlling interest in Joint Ventures) for the following project: Chicago Department of Transportation (CDOT) Alleys (Various Locations) - Package 7 Chicago, IL The Chicago Department of Transportation ("CDOT") Capital Program - Alleys (Various Locations) - Package 7 projects are located at: 22931 W. Arthur Ave.: W. Arthur Avenue/ W. Devon Avenue/N. Claremont Avenue/ N. Oakley Avenue - Ward 50 22932 W. Lawrence Ave.: W. Lawrence Avenue/ W. Leland Avenue/N. Malden Street/ N. Magnolia Avenue - Ward 46 22933 W. Leland Ave.: W. Leland Avenue/ W. Wilson Avenue/N. Central Park Avenue/ N. Drake Avenue - Ward 33 22934 W. Balmoral Ave.: W. Balmoral Avenue/ W. Summerdale Avenue/ N. Clark Street/ N. Glenwood Avenue - Ward 48 22935 W. Wilson Ave.: W. Sunnyside Avenue/ N. Sacramento Avenue/ N. Richmond Street - Ward 33 22936 W. Berteau Ave.: W. Berteau Avenue/ W. Belle Plaine Avenue/ N. Harding Avenue/N. Springfield Avenue - Ward 39 22937 W. Leland Ave.: W. Leland Avenue/ W. Eastwood Avenue/ N. Clarendon Avenue - Ward 46 22938 W. Lawrence Ave.: W. Lawrence Avenue/W. Leland Avenue/ N. Albany Avenue/ N. Whipple Street - Ward 33 22939 W. Argyle St.: W. Argyle Street/W Ainslie Street/N. Shore Channel Trail/ N. Francisco Avenue - Ward 40 The Project includes reconstruction of alley sewers, subgrade and pavement utilizing recycled construction materials and methods implemented by the City of Chicago, full depth alley pavement reconstruction. In addition, the Work includes proper handling and disposal of onsite material, portland cement concrete base course, hot-mix asphalt surface course, sewer and drainage structures, sewer cleaning and televising, vortex restrictors, concrete curb and gutter, concrete sidewalks and ADA Ramps various depths, concrete driveways, concrete garage aprons, concrete alleys, pre-molded rubber Speed Bumps, permeable concrete block pavers (W. Balmoral Ave. and W. Leland Ave./ W. Eastwood Ave.), bedding & void opening aggregates for permeable concrete block pavers, geotechnical fabric, topsoil, and hydraulic seeding. Contractor will be required to prepare a Phasing and Logistics Plan within 30 days of Notice to Proceed ("NTP") for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. Contractor shall provide critical submittals, including sewer and drainage structures and pavers, as applicable, within 30 days of issuance of the NTP. On-site construction work at each alley location must be completed within 45 calendar days from commencement of work for alleys without concrete block pavers, and 60 days for alleys that include concrete block pavers. Question Deadline 05/25/2026 All questions regarding this contract must be submitted in writing, via email to Dee Taylor, Contract Officer at: dee.taylor@cityofchicago.org

GC Bidding

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

July 16, 2026

Project location map

Multiple locations, Chicago, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.