BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Site work and new construction of a bridge / tunnel in Huntsville, Arkansas. Completed plans call for the construction of a bridge / tunnel.

The project involves span crossings at War Eagle Creek. Site Visits Available April 20, 2026 - May 1, 2026 Due date to submit written questions - May 1, 2026 Due date for answers to written questions May 8, 2026 Anticipated Award Date June 12, 2026 Project Implementation Date July 1, 2026 Submit any questions requesting clarification of information contained in this Bid Solicitation in writing via email or Beacon The AGFC is seeking qualified contractors to provide all labor, materials, equipment, and additional permits (AGFC has already obtained the 401, 404, STAA , and all required Environmental Clearances) necessary for the construction of one new bridge crossing and associated approaches on property owned by the Roberta Pearl Box Family Trust in Madison County, Arkansas. The road and crossing are not public, they are privately owned. AGFC has a Stream Restoration Agreement with the owner. This crossing spans a single stream segment where AGFC has implemented ongoing stream restoration and aquatic habitat improvement projects. The contractor shall also be responsible for providing a bridge design that meets the specifications outlined in this RFP; full engineered drawings are not required. However, the contractor must furnish a practical and structurally sound design suitable for the site and intended load capacity. The owner of the road and crossings has right to inspection and approval that specifications have been met. *See Attachment I in the Response Packet for reference photos of the crossings to be replaced* The work associated with this project shall be divided into three (3) phases. Contractors shall provide itemized pricing for each phase and each sub-item listed. AGFC reserves the right to award phases independently and may elect to self-perform a portion based on pricing and operation considerations. Phase 1: Notching and removal of the existing crossing Phase 2: Design and construction of new crossing Phase 3: Completion of approaches and associated erosion mitigation The site is located within private property off of County Road 2035 approximately 2 miles East of the City of Huntsville in Madison County, Arkansas. (-93.701486, 36.076916).

GC Bidding

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2026

July 1, 2026

Project location map

Co Rd 2035, Huntsville, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.