BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 20, 2026

This is a service / maintenance or supply contract in Moline, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 28, 2026, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for the reconstruction of I-74 and IL5 interchange in Moline into a diverging diamond interchange. Construction contract 64H87 includes reconstruction of I-74 and IL 5 using PCC Pavement, reconstruction of the existing cloverleaf interchange into a DDI, reconstruction of the structure carrying IL5 over 27th Street, reconstruction of the structure carrying IL5 over I-74, reconstruction of the structure carrying I-74 over 38th Avenue, culvert replacements throughout the project limits, drainage, subsurface drainage, landscaping, overhead sign trusses, construction of a multi-use path, ADA ramp improvements, traffic signal improvements, lighting improvements, pavement marking, and signing. The following structures are included in this project: o S.N. 081-0095: IL5 over 27th Street o S.N. 081-0096: IL5 over 27th Street o S.N. 081-0097: IL5 over I-74 o S.N. 081-0098: IL5 over I-74 o S.N. 081-0109: I-74 over 38th Avenue o S.N. 081-0110: I-74 over 38th Avenue The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 30 - RFQ - Reconstruction of I-74/ IL5 Interchange in Moline into a Diverging Diamond Interchange, Phase III Project

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
140
Bidding Soon
1,601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2026

Project location map

I-74, Moline, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.