BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

This is a service / maintenance or supply contract in Bradley, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2026, at 10:30 AM at the Region Two/District Three Office in Ottawa. Phase III engineering services are required to provide construction inspection for contract 66863 including the following: o I-57 - reconstruction of 1.7 miles to provide 2-lanes in each direction with a concrete median barrier o IL 17 - reconstruction from N. Fairmont Avenue to west of Eastgate Industrial Parkway o North Frontage Road - reconstruction from Eastgate Drive to west of Eastgate Industrial Parkway o South Frontage Road - reconstruction from Eastgate Drive to west of Oakdale Avenue o Eastgate Drive - reconstruction of 1200 feet around IL 17 o S.N. 046-0154: I-57 over IL 17 - removal and replacement o S.N. 046-9904: KB&S Railroad over I-57 - removal and replacement o S.N. 046-W8805: Retaining Wall at Ramp D - new structure o S.N. 046-W8806: Retaining Wall at Ramp B - new structure o S.N. 046-W8807: Retaining Wall at ComEd Property - new structure o S.N. 046-N5738: Noise Abatement Wall - new structure o S.N. 046-N5739: Noise Abatement Wall - new structure o S.N. 046-N5743: Noise Abatement Wall - new structure o S.N. 046-N5744: Noise Abatement Wall - new structure o S.N. 046-N5745: Noise Abatement Wall - new structure The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 34 - RFQ - Interchange Reconstruction of I-57 over IL 17 in the City of Kankakee, Phase III Project

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
249
Bidding Soon
4,146
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

Project location map

I-57, Bradley, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.