BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Site work and new construction of a power facility in Houston, Texas. Completed plans call for the construction of a power facility.

Traction Power Substation Design-Build. Question Deadline 05/15/2026 at 5:00 PM CT Please submit RFI Responses and questions regarding this RFI electronically The Metropolitan Transit Authority of Harris County (METRO) is conducting a Request for Information (RFI) from interested parties regarding Substation Hardware Replacement. Metro is evaluating procurement strategies for replacement of hardware within existing traction power substations. Current design is approximately 30% complete. Due to the hardware and installation driven nature of the work, METRO is considering offering this contract as a Progressive Design-Build to integrate the hardware manufacturer and installer into the design process and have a single point of responsibility and delivery.

GC Bidding

Power Plant

$20,000,000.00

Public - County

New Construction, Site Work

33

5

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
152
Bidding Soon
2,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.