BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Finleyville, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sealed proposals are requested for a Paving Project on McChain Road, Jack Street, Hobbitt Lane, and Aragon Place. The work generally includes placing a 1.50" depth (SY) and Superpave Asphalt, 9.5 mm Wearing Course, 1.50" depth (Tons). All roadwork and curb as directed by the Township. The project is to be bid either as a lump sum or as three alternate bids, as specified in the proposal and contract documents. Proposals must be submitted on township-provided forms, in a sealed envelope clearly marked for "Union Township Road Paving Projects." Performance, Labor and Material Payment Bonds, Public Liability and Property Damage Certificates of Insurance, and Workman's Compensation Certificates are required. Each proposal must be accompanied by a Certified Check or Bidder's Bond for 10% of the proposal amount. Proposals must remain firm for 60 days and may not be withdrawn during this period without forfeiting the bid guarantee. The township reserves the right to reject any or all proposals or waive any informalities.

Sub-Bidding

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
119
Bidding Soon
1,497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

June 17, 2026

Project location map

Multiple Locations, Finleyville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.