Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 10, 2026 at 8:00 PM
Updated May 15, 2026
Demolition, site work, paving and new construction of a pre-engineered storage facility in Charleston, West Virginia. Completed plans call for the demolition of a 23,560-square-foot pre-engineered storage facility.
The work involves the installation of a new Pre-Engineered Metal Building (PEMB) of approximately 23,560 square feet for the storage of Snow Removal Equipment at West Virginia International Yeager Airport. Tasks include removal of existing pavement and general site clearing, installation of erosion and sediment control devices, construction of the PEMB with concrete footings, installation of a new asphalt-paved roadway, and installation of new utilities such as water, sanitary, electrical, telecommunication, and storm drain. Additional work includes the construction of new fencing and a gate, installation of new security cameras and card readers, placement of bollards, sidewalk, and pavement marking. The description of work is not final and is not a substitute for a full plan set. Anticipated trades or contractors include demolition, concrete, electrical, mechanical, plumbing, and PEMB.
GC Bidding
Warehouse / Distribution - Pre-Engineered Storage Building
$2,000,000.00
Public - City
Demolition, New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2026
July 30, 2026
100 Airport Road, Charleston, WV
Related To This Project
Charleston, WV
Bid Date: May 23 2026
Charleston, WV
Bid Date: Jun 18 2026
Charleston, WV
Bid Date: May 08 2026
Charleston, WV
Bid Date: Jun 08 2026
Charleston, WV
Bid Date: May 26 2026
Charleston, WV
Bid Date: May 28 2026
Charleston, WV
Bid Date: Jun 09 2026
Charleston, WV
Bid Date: May 28 2026
Charleston, WV
Bid Date: Jun 12 2026
Charleston, WV
Bid Date: Jun 02 2026
Charleston, WV
Bid Date: May 26 2026
Charleston, WV
Bid Date: Jun 15 2026
Charleston, WV
Bid Date: May 13 2026
Charleston, WV
Bid Date: May 11 2026
Charleston, WV
Bid Date: May 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
