Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a civil project in Pendleton, Oregon. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Region 5 I-84: Rieth Interchange and Umatilla River Bridges Old Oregon Trail Highway Joshua McCullough I-84: Rieth Interchange and Umatilla River Bridges Project on the Old Oregon Trail Highway (Rt. No. I-84) near Pendleton. FAP No. S006(181). ($ 5,000,000 - $ 10,000,000). Req. approx. 1,500 ft2 temp. signs; 4 ea seq. arr. signs; 5 ea PCMS; 2 ea rdr. spd. trlr.; 92,168 ft temp. striping; 1,800 ft temp. barr.; 7 ea temp. imp. atten.; const. & rem. temp. rdbd. & surf.; 10 ea ch. dam; eros. & sed. ctrl. mngr.; 22 ea inlet prot.; 2,500 ft sed. barr.; const. surv. wrk.; 5,000 ft asph. pvmt. sawcut.; 520 ft conc. sawcut.; 5,200 yd3 exc.; 200 yd3 st. emb.; 200 yd2 subg. stab.; prep. shldr.; 11,000 yd2 geot.; fin. rdbd.; 606 ft vid. insp.; 606 ft pipe; 130 ft2 culv. end sl.; 60 ea RR flag.; br. jack.; br. rem. wrk.; 10,444 yd2 conc. dk. micro-mill.; 10,444 yd2 hydrodemo.; 187 lb reinf.; 1.2 yd3 str. conc.; 9,831 yd2 surf. text.; 725 yd3 str. conc. o'lay mtrl.; 10,444 yd2 const. str. conc. o'lay; 7 ea bear. dev.; 167 ft3 elas. conc. nos. mtrl.; 1,003 ft2 const. elas. conc. nos.; 466 ft ht. app. jt. seal repl.; 191 ft precom. fm. sil. jt. seal; 42 ft2 conc. sl. pav.; 12 ea br. ID mrkr.; CLSM fill; dk. hydrodemo. contain.; 192 yd2 cl. 2 prep.; 48 ea snowplow deflect.; 15,100 yd2 CPPR; 9,000 ton aggr. base; 4 ton emuls. asph. fog ct.; 5,000 ton ACP (300 ton PG 64-28); 1,000 ft cr. seal.; 1,630 yd2 cont. reinf. conc. pvmt.; 192 ft term. exp. jt.; 192 ft term. exp. jt. sleep. slab; 860 yd2 cont. reinf. conc. pvmt. rep.; 4 yd2 spall rep.; 1,630 yd2 conc. pvmt. sawcut text.; 1,113 ft gd. rl.; 2,400 ft cable barr.; 4 ea imp. atten.; 3 mile rmbl. strips; 50,000 ft plural striping; 2 acre seeding. This project requires Railroad Insurance. Completion Time: October 31, 2027. Class of Work: Bridges and Structures. This project contains asphalt and fuel escalation clauses. This Project Contains a 15% Indian Employment Preference Goal. Project Manager: Joshua Mccullough, Email: Odotconstructionlagrande@odot.oregon.gov The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 3 - I-84: Rieth Interchange and Umatilla River Bridges *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Bridges / Tunnels
$10,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2026
August 3, 2026
Old Oregon Trail Hwy, Pendleton, OR
Related To This Project
Pendleton, OR
Bid Date: May 08 2026
Pendleton, OR
Bid Date: May 21 2026
Pendleton, OR
Bid Date: Mar 26 2026
Pendleton, OR
Bid Date: May 07 2026
Pendleton, OR
Bid Date: May 07 2026
Pendleton, OR
Bid Date: Mar 25 2026
Pendleton, OR
Bid Date: Mar 25 2026
Pendleton, OR
--
Pendleton, OR
Bid Date: Dec 15 2025
Pendleton, OR
Bid Date: Dec 17 2025
Pendleton, OR
--
Pendleton, OR
Bid Date: Dec 19 2025
Pendleton, OR
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
