Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Demolition, site work, paving and new construction of a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Route I-270 St Louis County. Bridge Replacement, 2 Walls, Add Pavement Widening and Ada From West of Lilac Avenue to Riverview Drive in St. Louis, the Total Length of Improvement Being 0.938 Miles. Route I-270 St Louis County. Coldmill and Resurface From West of Route 367 to East of Lilac Avenue in St. Louis, the Total Length of Improvement Being 2.375 Miles. Route I-270 St Louis County. 4 Bridge Replacements, 2 Walls and Pavement Widening From West of Route 367 to East of Bellefontaine Road in St. Louis, the Total Length of Improvement Being 1.719 Miles. Range: Range: $25M to $50M The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F01 - Bridge Replacement, 2 Walls, Add Pavement Widening and ADA (I-270) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Sub-Bidding
Bridges / Tunnels
$50,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2026
August 17, 2026
I-270, Saint Louis, MO
Related To This Project
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 02 2026
Saint Louis, MO
Bid Date: Apr 29 2026
Saint Louis, MO
Bid Date: May 08 2026
Saint Louis, MO
Bid Date: May 08 2026
Saint Louis, MO
Bid Date: May 14 2026
Saint Louis, MO
Bid Date: May 08 2026
Saint Louis, MO
Bid Date: May 12 2026
Saint Louis, MO
Bid Date: May 12 2026
Saint Louis, MO
Bid Date: May 15 2026
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 02 2026
Saint Louis, MO
Bid Date: May 15 2026
Saint Louis, MO
Bid Date: Jun 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
