Published June 9, 2026 at 8:00 PM
Updated June 11, 2026
Site work for a water / sewer project in Fredericksburg, Virginia. Completed plans call for site work for a water / sewer project.
The City of Fredericksburg (City) is conducting a solicitation for storm drainage improvements at the intersection of Lewis Street and Sophia Street in the City. The purpose of the project is to remove failed and undersized storm sewer infrastructure and replace it with upgraded drainage facilities designed to improve system capacity, reliability, and long-term performance. The project consists of storm drainage improvements at the intersection of Lewis Street and Sophia Street. The work involves removing failed and undersized storm sewer infrastructure and replacing it with upgraded drainage facilities to improve system capacity, reliability, and long-term performance. Specifically, the scope includes removal of an existing 8-inch storm sewer pipe, two existing 12-inch storm sewer pipes, one existing drop inlet, and one existing manhole. These will be replaced with a new manhole, a new drop inlet, a new 24-inch storm sewer pipe, and a new 30-inch storm sewer pipe. The project also requires completion of all asphalt restoration, installation and maintenance of erosion and sediment control measures, traffic control measures, and any other required temporary controls or appurtenances for safety and protection of the public, adjacent properties, and existing infrastructure during construction. Disturbed areas must be restored upon completion of the work in accordance with applicable standards and project requirements. PERIOD OF CONTRACT: Date of Award through December 1, 2026 This project consists of the following: pavement milling, road reconstruction, full depth patching, repair, asphalt concrete resurfacing pavement markings, remove and replace curb and gutter, sidewalks, bricks, handicap ramps, joint repair, and related work on Sophia Street and Lewis Street in the City as designated by the Director of Public Works. a. Traffic Control at construction sites b. Mobilization c. Project - Reconstruction of Sophia Street and Lewis Street Drainage Project FY-26 i. Hot Mix Asphalt - VDOT Type SM - 9.5 A 1.5", 231 Tons ii. Hot Mix Asphalt - VDOT Type BM - 25 4", 528 Tons iii. Base Aggregate No. 21-A, 223 Tons iv. Remove and Replace ("R&R") CG-6, 170 linear feet (LF) v. R&R SIDEWALK, 650 square feet (SF) vi. R&R CG-12, 8 eaches vii. R&R CG-9B, 108 SF viii. Stop Bar (Thermoplastic), 2 eaches In addition to the items above, the following requirements apply to the project: a. Asphalt will be adjusted per VDOT form C-16a b. Temporary striping should be placed within 24 hours after new asphalt is in place c. Type II safety vests must be worn by all workers on work d. Inlet protection must be used during milling operation e. No diesel fuel shall be used for bond breaker f. Optional Stage Area See Plan: Contractor - contractor shall be responsible for the cost necessary for erosion and sediment control and restoration to its original condition. Contact Josh McCormack (jlmccormack@fredericksburgva.gov) and Rachel Jones (rmjones@fredericksburgva.gov) via email for further information. All requests for clarification or questions regarding this bid must be received no later than 2:00 p.m. on May 25, 2026. All posted clarifications or addenda must be signed and accompany any bid submitted.
Post-Bid
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2026
July 10, 2026
Sophia St & Lewis St, Fredericksburg, VA
Related To This Project
Fredericksburg, VA
Bid Date: May 25 2026
Fredericksburg, VA
Bid Date: May 18 2026
Fredericksburg, VA
Bid Date: Jun 11 2026
Fredericksburg, VA
Bid Date: May 14 2026
Fredericksburg, VA
--
Fredericksburg, VA
Bid Date: May 21 2026
Fredericksburg, VA
--
Fredericksburg, VA
Bid Date: Jun 15 2026
Fredericksburg, VA
Bid Date: Apr 24 2026
Fredericksburg, VA
Bid Date: May 19 2026
Fredericksburg, VA
--
Fredericksburg, VA
--
Fredericksburg, VA
Bid Date: Apr 08 2026
Fredericksburg, VA
--
Fredericksburg, VA
Bid Date: Mar 17 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.