BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a mixed-use development in Temple, Texas. Completed plans call for site work for a road / highway; water / sewer project; bridge / tunnel; and sidewalk / parking lot.

The project consists of constructing approximately 6,200 linear feet of 40-foot-wide, two-lane roadway with a center turn lane, including sidewalks, a precast bridge structure, and 7,660 linear feet of 8-inch, 10-inch, and 12-inch waterline. The scope also includes roadway signalization, lane widening, and the addition of designated turn lanes at F.M. 93. The selected Contractor shall complete the work within 730 consecutive calendar days from Notice to Proceed. Question Deadline 06/09/2026 at 12:00 PM CT Submit questions in writing to the engineer of record Jonathan Cannon, PE, Walker Partners, LLC at jcannon@walkerpartners.com The engineer's estimate of probable cost associated with this project is $13,563,786.07.

GC Bidding

Roads / Highways

$13,564,000.00

Public - City

Paving, Site Work

281

7

23

7

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
126
Bidding Soon
2,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.