Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Nevada City, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
: This bridge - commonly referred to as Edwards Crossing- was built in 1904 and is a historic structure with a large span over the South Yuba River. The site is also a popular recreation facility. This bridge is structurally deficient and currently has a weight restriction due to its structural limitations. The Federal HBP program provides reimbursable funds for 100 percent of eligible project costs. The project will evaluate various replacement scenarios before moving forward with project design and construction. PROJECT JUSTIFICATION: The project will provide a safe permanent crossing over the South Yuba River on North Bloomfield Road since the existing structure is structurally deficient The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of May 11, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$5,680,411.00
Public - County
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2030
N Bloomfield Rd, Nevada City, CA
Related To This Project
Nevada City, CA
Bid Date: May 08 2026
Nevada City, CA
--
Nevada City, CA
--
Nevada City, CA
--
Nevada City, CA
--
Nevada City, CA
--
Nevada City, CA
Bid Date: May 08 2026
Nevada City, CA
Bid Date: Mar 06 2026
Nevada City, CA
Bid Date: Apr 09 2026
Nevada City, CA
Bid Date: Jun 16 2021
Nevada City, CA
--
Nevada City, CA
Bid Date: Mar 23 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
