BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 4, 2026

Site work for a sidewalk / parking lot in Green Bay, Wisconsin. Completed plans call for site work for a 2,850-square-foot sidewalk / parking lot.

Sealed bids for the Village of Howard Multi-Use Trail will be received for approximately the following quantities: 2,850 square feet of concrete sidewalk, 3,800 tons of base aggregate dense, 400 tons of asphaltic surface, 1,200 cubic yards of excavation and grading, 1,990 cubic yards of topsoil stripping and replacement, and 78 linear feet of culvert pipes. ALL WORK SHALL OCCUR BETWEEN JULY 20, 2026 AND AUGUST 28, 2026. Question Deadline 05/22/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Each proposal must be accompanied by a bid bond or certified check equivalent to 5% of the maximum proposal. The owner reserves the right to reject any or all bids, waive or not waive any informalities in the bids received, and to accept any proposal deemed most favorable to the owner's interest. No bidder may withdraw their bid within 60 days after the opening date. This project is partially funded by the Carbon Reduction Program and is subject to State and Federal laws and regulations associated with that program. Federal Davis-Bacon Act wage rates are applicable, and bidders must comply with all funding/grant requirements, labor standards, minimum wage and fringe rates, and nondiscrimination requirements. The grantee's policy regarding increased use of minority and women's businesses applies, and bidders must make specified affirmative efforts, including contacting at least five MBEs and five WBEs to solicit bids 15 days prior to bid opening. Documentation of all contacts must be submitted with the bid. The project is also subject to Build America, Buy America Act requirements for domestic production of materials, with certain waivers applicable.

Bid Results

Sidewalks / Parking Lot

$306,322.00

Public - City

Site Work

59

10

3

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

July 20, 2026

Project location map

Howard Blvd, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.