BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 14, 2026

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

The Keho Dam Project is located approximately 35 km northwest of Lethbridge, Alberta, and forms part of the Lethbridge Northern Headworks System. Site location plan and photographs are shown in Appendix A, and relevant drawings are included in Appendix B of the Terms of Reference. The Keho Lake Reservoir is an off-stream irrigation storage reservoir originally constructed in 1921 as the East Dyke and rehabilitated in 1984 by the Government of Alberta. The rehabilitation included raising the dam by 1.8 m, constructing a new low-level outlet (LLO), and adding two upstream earth jetties. Electrical and gate control upgrades to the LLO were completed in 2017. Together with the Turin Branch Canal headworks, the dam marks the downstream end of the Lethbridge Northern Headworks Canal system. The dam consists of a homogeneous earth-fill embankment approximately 3,200 m long, with a maximum height of 9.9 m, crest width of 8.5 m, and design crest elevation of 966.55 m. The upstream slope is protected with riprap, the downstream slope is vegetated, and the gravel crest serves as a local access road. The reservoir covers approximately 2,200 ha and stores 95,380 dam3 at a design full supply level of 964.24 m, with a drainage area of 52.5 km2. The reservoir receives inflows from the Lethbridge Northern Headworks main canal, with a design operating flow of 46.5 m3/s and a maximum canal capacity of 109 m3/s. The LLO has a design discharge capacity of 34 m3/s, while the downstream Turin Branch Canal has a capacity of up to 86 m3/s near the headworks. The LLO is a cast-in-place concrete structure comprising an inlet, dual box conduits, a gatewell with two operating guard gates, and a stilling basin. Keho Lake Dam has no service or emergency spillway. Operationally, the LLO is controlled by the Lethbridge Northern Irrigation District under agreement with Alberta Agriculture and Irrigation to supply irrigation water via the Turin Branch Canal. Dam breach inundation studies can become outdated if not periodically reviewed and updated. AGI uses key administrative and physical triggers to prompt updates to inundation studies that include identified gaps in previous studies, improved hydrological and topographical data, advances in modeling and mapping, changes in regulatory requirements, infrastructure upgrades, and new or expanded downstream development. In recent years, the operation at Keho Lake Dam has become somewhat complex, particularly in light of evolving operational objectives and the development of a new operations plan with a revised Full Supply Level. Reservoir operations and inflows are strongly influenced by local weather variability and agricultural demand, introducing operational complexities not present at other in-stream reservoirs. Even short-duration or low-intensity rainfall events can result in rapid reservoir level increases, particularly under mid summer conditions characterized by high crop demand, elevated reservoir levels, and full canal inflows. Limited spillway capacity may lead to unanticipated high reservoir levels, increasing overtopping risk and the potential for surcharged piping condition. The 2024 Dam Safety Review highlighted several critical gaps in the existing dam breach inundation studies (2005 and 2011), including the lack of updated breach modeling, inadequate assessment of potential cascading impacts on the Picture Butte Reservoir and Dyke, and inundation mapping approaches that may no longer reflect current standards. Given the complexity of downstream flow paths, identified gaps in previous studies, and the potential for increased flood risk to the Town of Picture Butte, an updated Dam Breach Inundation Study (DBIS) is required to support informed decision-making, strengthen confidence in the dam's consequence classification, and ensure alignment with current dam safety practices. The updated DBIS will also provide critical information to update and improve the dam's emergency preparedness and response planning documents. If you have questions, please contact the Contact Person below only by email. Contact Person Lewis Cheung Senior Dam Safety Engineer Method of Contact dam.safety@gov.ab.ca

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

Project location map

To Be Determined, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.