Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 8, 2026 at 8:00 PM
Updated June 10, 2026
Site work and paving for a sidewalk / parking lot in Collierville, Tennessee. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Concrete Sidewalk and Curb Improvements Bailey Station Elementary School and Tara Oaks Elementary School Collierville Schools will receive bids for Concrete Sidewalk and Curb Improvements at Bailey Station Elementary School, 3435 Bailey Station Road Road, Collierville, Tennessee 38017 and Tara Oaks Elementary School, 600 E. Harpers Ferry Drive, Collierville Tennessee 38017. General Terms and Conditions, Scope of Work, Specifications and Drawings are contained in this bid. Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission. Requests for any and/or all Change Orders must be submitted in writing to Robert Morris, Operations Supervisor, Collierville Schools, rmorris@colliervilleschools.org. Questions regarding bid specifications should be directed to Robert Morris, Operations Supervisor, Collierville Schools, rmorris@colliervilleschools.org, no later than 4:00 P.M., Friday, May 15, 2026. Purchasing questions should be directed to Linda Tedford, ltedford@colliervilleschools.org, no later than 4:00 P.M., Friday, May 15, 2026. All questions must be submitted by email Locations Bailey Station Elementary School, 3435 Bailey Station Rd., Collierville, Tennessee 38017 Tara Oaks Elementary School, 600 E Harpers Ferry Dr., Collierville, Tennessee 38017 Scope of work Furnish all labor, materials, tools, equipment, and permits necessary to: 1. Remove damaged areas and install new concrete sidewalks, curbs and gutter, and ADA curb ramps. 2. Fill new and existing expansion joints with backer and/or sealant. 3. The bidder shall be responsible for locating and protecting all utilities. 4. The bidder shall be responsible for cleaning, backfilling, final grading, and sod. Scope Remove specified areas of damaged sidewalk and curbs. Replace with new sidewalks, curbs and gutter, and ADA curb ramps. Approximately 3,193 square feet of sidewalks, 135 feet of 6"x6"x6" curb and gutter, and four (4) ADA curb ramps. Remove and replace a one driveway apron. Minimum 6" thick, 4,000 PSI concrete over 4" thick compacted aggregate base. Approximately 25'x 30'. Add Alternates Replace asphalt pads and paths with concrete. Approximately 750 SF. Replace asphalt paths with concrete sidewalks. Approximately 140'x6'. Clean and fill expansion joints at Bailey Station Elem. Clean and fill expansion joints at Tara Oaks Elem. Schedule This is a turn-key project that can begin May 27, 2026, and must be completed by June 30, 2026. The available work hours will be Monday through Friday from 7 AM to 3 PM. Specifications 1. Obtain all necessary permits and locate utilities. 2. Coordinate with Collierville Schools to avoid disruptions to school activities and traffic. 3. Stage equipment, tools and materials in designated areas to avoid unnecessary damage to the lawn therefore minimizing the need for grading and sod grass. 4. Protect existing sidewalks, driveways, poles, ornaments, utilities, and structures from damage. 5. Remove and dispose of damaged concrete sidewalks, ramps, gutters, curbs, etc. where necessary. 6. Prepare the site for new concrete. Remove roots, poor soil, etc., and grade to ensure adequate drainage. 7. Thoroughly compact subgrade by rolling or tamping before placing any concrete. All soft or spongy places shall be removed and filled with suitable material which shall be compacted in layers not exceeding six (6") inches. 8. Pin existing concrete with a minimum of three (3) each 3/8" diameter X 16" long steel rods evenly spaced to tie into new concrete. 9. Install 3/8" wide expansion joints where new and old concrete meet and at a minimum of one expansion joint every thirty (30') feet. 10. Install three (3) each 3/8" diameter X 16" long pins evenly spaced at each expansion joint. 11. Construct each sidewalk and curb ramp to ADA standards found at 12. Install 3,500 to 4,000 psi concrete with fiber, at a minimum of four (4") inches thick. 13. Place three (3) each 3/8" diameter X 16" long pins evenly spaced at each control joint. 14. Strike control joints at approximately equal intervals for aesthetics. 15. Align curb, gutter and sidewalk joints. Provide scored joints at intervals similar to existing sidewalks and curbs. Apply a light broom finish to surface perpendicular to the direction of travel. 16. Form, pin, pour, and shape each 6"x6"6" curb and gutter similarly. Provide scored joints and a trial finish with clean and consistent rounded edges. 17. Remove all forms and stakes. Remove and dispose of rubble and excess construction materials. Prepare and backfill the surrounding area with clean fill dirt before placing sod as needed to cover all bare dirt, ruts, and gouges. 18. Prepare expansion joints for filler and sealer. Remove all damaged, cracked and loose or compromised joint filler. Remove plant growth, dirt, dust, and debris from voids. Fill expansion joints to industry standards with backer rod and flexible, self-leveling sealant designed for concrete expansion joints. 19. Leave the site in a reasonably clean, level and smooth, aesthetically pleasing state. Repair list at Bailey Station Elementary 1. Replace 10'x15' section of sidewalk near cafeteria hall entrance. 2. Replace 5'x26' section of sidewalk near 303. 3. Replace 10'x10 section of sidewalk near 309. 4. Replace 5'x5' section of sidewalk near the corner of teacher's parking lot. 5. Replace 5'x5' section of sidewalk near the South side playground. 6. Replace 5'x25' section of sidewalk near the South side playground. 7. Replace 5'x5' section of sidewalk near 100 hall exit. 8. Replace 5'x9' section of sidewalk near 100 hall exit. 9. Replace 5'x9' section of sidewalk in the front drive near 114. 10. Replace 5'x5' section of sidewalk and 5' of curb and gutter near 200. 11. Replace 5'x10' section of sidewalk near 400 hall exit. 12. Replace 10' of curb and gutter near the BUS stop sign. 13. Replace 5'x5' section of sidewalk near the NW corner of the gym. 14. Replace the bus driveway concrete apron at Bailey Station Road. Approx. 25'x30' 15. Clean and fill the sidewalk expansion joints throughout the campus. Approximately 1250 LF. 16. Remove asphalt pads and walks and replace the entire areas with concrete. (Areas near the 100 and 200 hall exits) 17. Remove asphalt walk paths leading to the North playground and replace with 6' wide concrete sidewalks. Repair list at Tara Oaks 1. Replace 5'x7' section of sidewalk between Annex and Main Building. 2. Replace 40'x5' section of sidewalk at the car riders drop off. 3. Replace 5'x10 section of sidewalk near the storm drain. 4. Replace 70'x5' section of sidewalk between the teacher's parking lot 200 exit. 5. Replace 9'x7' section of asphalt at the NW corner of the teacher's parking lot. 6. Replace 2'x21' section of sidewalk near the generator. 7. Replace 10'x12' ramp and 25' section of curb and gutter. 8. Replace 11'x8' section of sidewalk near cafeteria hall exit. 9. Replace 5'x5' section of sidewalk near the dumpster. 10. Replace 22'x5' of sidewalk and a 20' section of curb and gutter. 11. Replace 60' of curb and gutter. 12. Replace 5'x10' of sidewalk on the bus drive. 13. Replace 5'x10' of sidewalk at 300 exit. 14. Replace 10'x20' sidewalk and ramp and 20' of curb and gutter on the bus drive at 300 exit. 15. Replace ADA ramp in bus drive sidewalk at West playground. 16. Replace ADA ramp at West playground. 17. Replace 7'x9' section of sidewalk at E. Harpers Ferry Dr exit. 18. Replace 10'x10' section of sidewalk in front drive. 19. Replace 5'x8' section of sidewalk on E. Harpers Ferry Dr. 20. Replace 5'x5' section of sidewalk on E. Harpers Ferry Dr. 21. Replace 5'x10' section of sidewalk on E. Harpers Ferry Dr. 22. Replace 10'x10' section of sidewalk on E. Harpers Ferry Dr. 23. Replace 10'x10' section of sidewalk in the front drive near the main entrance. 24. Clean and fill the sidewalk expansion joints throughout the campus. Approximately 1,500 LF.
Award
Sidewalks / Parking Lot
$87,815.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2026
June 1, 2026
Multiple Locations, Collierville, TN
Related To This Project
Collierville, TN
Bid Date: Apr 22 2026
Collierville, TN
--
Collierville, TN
--
Collierville, TN
Bid Date: Jun 17 2026
Collierville, TN
Bid Date: May 06 2026
Collierville, TN
Bid Date: May 14 2026
Collierville, TN
Bid Date: Apr 22 2026
Collierville, TN
Bid Date: Apr 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
