BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 10, 2026

Demolition, site work and asbestos abatement for a residential development in Auburn Hills, Michigan. Completed plans call for the demolition of a 2,500-square-foot residential development; for site work for a residential development; and for asbestos abatement for a residential development.

Reference Number 0000424000 The City of Auburn Hills (City) is soliciting bids from qualified contractors for the removal of all building components and site restoration on the property The City of Auburn Hills provided locations for the scope of work and the subsequent inspection area. An EPA certified and Michigan Department of Labor and Economic Opportunity (LEO) accredited Asbestos Building Inspector performed the inspection to locate and sample materials suspected of containing asbestos. Performance also provided project review, report preparation and consultation services during the course of this project. As part of this study, Performance completed the following: 1) Conducted an inspection of accessible areas to locate materials suspected of containing asbestos; 2) Collected bulk material samples for subsequent analysis by Polarized Light Microscopy (PLM); and, 3) Submitted bulk samples collected during this inspection to a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory for PLM analysis. Performance assembled the information collected during the study in this report, which details the laboratory results and locations of sampled materials. General Scope of Work - City Expectations of the Contractor: 1. Obtain a Demolition Permit from the City. Notes: Permit and inspection fees will be waived. The City will arrange, secure, and pay for utility cut-offs. 2. Secure the demolition site with temporary construction fencing and all necessary soil erosion prevention measures as required. 3. Complete the required lead-based paint abatement - Survey results in Appendix A. 4. Raze and remove the existing structure, which is approximately 2,500 square feet in size, and the related accessory buildings and hardscape. 5. Break up and remove all basements, footings, foundations, slabs, etc., under the demolished structures. 6. Remove and dispose of all debris off-site in a legal manner. 7. Backfill and compact basement and voids with engineered fill (95% modified compaction). 8. Supply and install two inches of topsoil over the disturbed areas and evenly grade. 9. Seed and mulch the disturbed areas. 10. Repair / replace disturbed concrete and asphalt as necessary. Question Deadline 06/01/2026 at 12:00 PM ET Please direct your questions to Devin Lang at (248) 364-6946, Monday through Friday, from 8:00 a.m. to 5:00 p.m., or via email at dlang@auburnhills.org. B) Bidders are responsible for submitting proposals before the stated closing time. Delays in the mail will not be considered. Any proposal received after the stated deadline will be rejected. C) Any bid may be withdrawn by giving written notice to the Clerk's Office before stated closing time. After stated closing time, no bid may be withdrawn or canceled for onehundred and eight (180) days.

Post-Bid

Residential Subdivision

$200,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
208
Bidding Soon
2,900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

June 23, 2026

Project location map

3077 Auburn Rd, Auburn Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.