Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 4, 2026 at 8:00 PM
Updated June 5, 2026
Site work for a water / sewer project in Venice, Florida. Completed plans call for site work for a water / sewer project; water / sewer project; water / sewer project; and water / sewer project.
The work consists of water main replacements, new water main construction, gravity sewer replacements, roadway milling, overlaying and re-striping, and miscellaneous sidewalk and driveway replacements on the Tarpon Center Drive peninsula. The scope includes: extending the existing 12-inch PVC water main approximately 1,550 LF from Higel Park to Inlet Circle; extending approximately 750 LF of 8-inch water main along Tarpon Center Drive to a new hydrant east of the South Jetty Beach concession stand; relocating Jetty Villas Condominiums' two 2-inch potable water master meters to the Tarpon Center Drive right-of-way; relocating the existing 3-inch potable water master meter at 1400 Tarpon Center Drive; abandoning the existing parallel 6-inch asbestos cement water mains along Tarpon Center Drive and connecting all services to the existing and new 12-inch water mains; replacing the existing asbestos cement water mains along Gibbs Road with approximately 800 LF of new 8-inch and 4-inch water main; replacing the existing asbestos cement water mains on Inlet Circle with approximately 1,750 LF of new 8-inch and 6-inch water main; installing approximately 52 new service lines from the new water mains on Gibbs Road and Inlet Circle to existing meters; replacement of approximately 642 LF of failing gravity sewer and 6 manholes along Tarpon Center Drive; abandonment of existing water main, force main, and gravity sewer mains as shown on the drawings; removal of the concrete median and milling and overlaying Tarpon Center Drive; restriping Tarpon Center Drive to provide buffered bike lanes and shared lane markings; and replacing driveway aprons and upgrading existing pedestrian facilities in the right-of-way where feasible to meet ADA requirements. Question Deadline 06/12/2026 at 1:00 PM ET All questions, comments, or concerns about this ITB must be submitted in writing to Mr. Peter Boers, Procurement- Finance Department, for the City of Venice, Room 204, 401 West Venice Avenue, Venice, FL 34285 or e-mail at pboers@venicefl.gov. Mr. Boers is the only designated representative of the City authorized to respond to comments
GC Bidding
Water / Sewer
$3,590,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2026
August 24, 2026
Tarpon Center Dr, Venice, FL
Related To This Project
Venice, FL
Bid Date: May 27 2026
Venice, FL
Bid Date: May 19 2026
Venice, FL
--
Venice, FL
Bid Date: Apr 24 2026
Venice, FL
Bid Date: Jul 09 2026
Venice, FL
Bid Date: Jun 23 2026
Venice, FL
Bid Date: Apr 01 2026
Venice, FL
Bid Date: Apr 28 2026
Venice, FL
--
Venice, FL
Bid Date: Feb 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
