BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2026 at 8:00 PM

Updated June 5, 2026

Site work for a water / sewer project in Venice, Florida. Completed plans call for site work for a water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

The work consists of water main replacements, new water main construction, gravity sewer replacements, roadway milling, overlaying and re-striping, and miscellaneous sidewalk and driveway replacements on the Tarpon Center Drive peninsula. The scope includes: extending the existing 12-inch PVC water main approximately 1,550 LF from Higel Park to Inlet Circle; extending approximately 750 LF of 8-inch water main along Tarpon Center Drive to a new hydrant east of the South Jetty Beach concession stand; relocating Jetty Villas Condominiums' two 2-inch potable water master meters to the Tarpon Center Drive right-of-way; relocating the existing 3-inch potable water master meter at 1400 Tarpon Center Drive; abandoning the existing parallel 6-inch asbestos cement water mains along Tarpon Center Drive and connecting all services to the existing and new 12-inch water mains; replacing the existing asbestos cement water mains along Gibbs Road with approximately 800 LF of new 8-inch and 4-inch water main; replacing the existing asbestos cement water mains on Inlet Circle with approximately 1,750 LF of new 8-inch and 6-inch water main; installing approximately 52 new service lines from the new water mains on Gibbs Road and Inlet Circle to existing meters; replacement of approximately 642 LF of failing gravity sewer and 6 manholes along Tarpon Center Drive; abandonment of existing water main, force main, and gravity sewer mains as shown on the drawings; removal of the concrete median and milling and overlaying Tarpon Center Drive; restriping Tarpon Center Drive to provide buffered bike lanes and shared lane markings; and replacing driveway aprons and upgrading existing pedestrian facilities in the right-of-way where feasible to meet ADA requirements. Question Deadline 06/12/2026 at 1:00 PM ET All questions, comments, or concerns about this ITB must be submitted in writing to Mr. Peter Boers, Procurement- Finance Department, for the City of Venice, Room 204, 401 West Venice Avenue, Venice, FL 34285 or e-mail at pboers@venicefl.gov. Mr. Boers is the only designated representative of the City authorized to respond to comments

GC Bidding

Water / Sewer

$3,590,000.00

Public - City

Site Work

52

13

3

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
118
Bidding Soon
2,043
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.