BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Site work and paving for a mixed-use development in Fargo, North Dakota. Completed plans call for site work for a road / highway; water / sewer project; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

This project is for the replacement of the water main, sanitary sewer mains, sanitary sewer services, storm inlet leads, concrete curb & gutter, asphalt pavement, and sidewalk repairs. The work includes tasks related to construction, sidewalks, curbs, gutters, removal and replacement of pipe, sawcutting sidewalk pavement, sewer and water construction, pavement removal, signage, and paving with asphalt or concrete. Location - On 8th Avenue South from 4th Street South to the east end of 8th Avenue South. Purpose The existing water main is cast iron pipe (CIP), which was installed up to 105 years ago and is being replaced with polyvinyl chloride (PVC) to minimize impacts and costs associated with breaks. The street reconstruction is necessary because the existing street section has deteriorated significantly and has exceeded its life expectancy. Reconstruction will include asphalt pavement, gravel base, curb and gutter, storm sewer inlets and leads, new sanitary sewer, new water main, driveway approaches, and sidewalk replacement. The project will be funded by a combination of City Funds (Wastewater Utility, Water Utility, Storm Sewer Utility and Infrastructure Sales Tax) and Special Assessments to the benefiting properties. Assessments will be applied per City policy. Sanitary Sewer F&I Manhole 4' Dia Reinf Conc 1 EA 2 Remove Manhole 1 EA 3 F&I 1-1/4" Trench Found Rock 4" thru 12" Dia 323.55 LF 4 Clean Pipe All Sizes All Types 323.55 LF 5 Connect Pipe to Exist Pipe 1 EA 6 Bore Pipe SDR 26 - 6" Dia PVC 50 LF 7 Remove Pipe All Sizes All Types 323.55 LF 8 F&I Pipe w/GB SDR 26 - 6" Dia PVC 551.24 LF 9 F&I Pipe w/GB SDR 35 - 12" Dia PVC 323.55 LF 10 Connect Sewer Service Water Main F&I Fittings C153 Ductile Iron 128 LB 12 F&I Hydrant 1 EA 13 Connect Pipe to Exist Pipe 1 EA 14 Remove Pipe All Sizes All Types 605.5 LF 15 F&I Pipe w/GB C900 DR 18 - 6" Dia PVC 5 LF 16 F&I Pipe w/GB C900 DR 18 - 8" Dia PVC 590.17 LF 17 F&I Gate Valve 6" Dia 1 EA 18 F&I Gate Valve 8" Dia 1 EA 19 Bore Pipe 1" Dia Water Service 10 LF 20 Bore Pipe 1.5" Dia Water Service 10 LF 21 F&I Pipe w/GB 1" Dia Water Service 731.8 LF 22 F&I Pipe w/GB 1.5" Dia Water Service 39.3 LF 23 Rem & Repl CS & Box 1" Dia 20 EA 24 Rem & Repl CS & Box 1.5" Dia 4 EA 25 Connect Water Service 24 EA 26 Furnish Temp Water Svc Storm Sewer Repair Manhole Floor & Invert 1 EA 28 F&I Inlet - Single Box (SBI) Reinf Conc 2 EA 29 Remove Inlet 2 EA 30 Connect Pipe to Exist Pipe 1 EA 31 Remove Pipe All Sizes All Types 32 F&I Pipe w/GB SDR 35 - 12" Dia PVC Paving Remove Pavement All Thicknesses All Types 2075 SY 34 F&I Casting Water Service 3 EA 35 Subgrade Preparation 2515 SY 36 F&I Woven Geotextile 2515 SY 37 F&I Class 5 Agg - 8" Thick 2515 SY 38 F&I Edge Drain 4" Dia PVC 1232 LF 39 F&I Curb & Gutter Standard (Type II) 1242.77 LF 40 Remove Curb & Gutter 1244.72 LF 41 F&I Sidewalk 4" Thick Reinf Conc 618 SY 42 Remove Sidewalk All Thicknesses All Types 632 SY 43 F&I Driveway 6" Thick Reinf Conc 415 SY 44 Remove Driveway All Thicknesses All Types 368 SY 45 F&I Asphalt Pavement FAA 43 w/ PG58H-34 686 Ton 46 Rem & Repl Casting - Self Leveling 1 EA 47 Casting to Grade - w/Conc 2 EA 48 Casting to Grade - no Conc 2 EA 49 GV Box to Grade - Blvd 1 EA 50 GV Box to Grade - w/Conc Signing F&I Sign Assembly 2 EA 52 F&I Sign Assembly & Anchor 5 EA 53 F&I Diamond Grade Cubed 6.13 SF 54 F&I High Intensity Prismatic Landscaping Mulching Type 1 Hydro 2400 SY 56 Seeding Type C 2400 SY 57 Weed Control Type B 2400 SY 58 Tree Protection 27 EA 59 Irrigation Repair Erosion Control Stormwater Management 1 LS 61 Temp Construction Entrance 1 EA 62 Inlet Protection - New Inlet 2 EA 63 Inlet Protection - Existing Inlet The estimated cost of construction is $967,524.13

GC Bidding

Roads / Highways

$967,524.00

Public - City

Paving, Site Work

29

5

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
16
Bidding Soon
441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

July 17, 2026

Project location map

8th Ave S, Fargo, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.