BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a mixed-use development in Farmington Hills, Michigan. Completed plans call for the renovation of a fire / police facility; and municipal facility.

Reference Number 0000424138 The project consists of the removal and replacement of the existing standby generator system at the City of Farmington Hills Division of Public Works facility, along with upgrades to support portable generator connections at (5) fire stations and multiple municipal facilities around the city of Farmington Hills. Work includes demolition and removal of the existing diesel generator and associated concrete foundation, site demolition, and preparation for installation of new equipment. A new concrete foundation will be poured, followed by installation of a new standby generator system, including associated electrical service equipment, conduit, and natural gas piping connections. Question Acceptance Deadline 05/21/2026 12:00 PM EDT Questions are submitted online No Purchase Type One Time Only- Delivery Date:After Award General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Labor and Materials Bond 100 %

Sub-Bidding

Fire / Police

$300,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 29, 2026

Project location map

Multiple Locations, Farmington Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.