BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a transportation facility in Salt Lake City, Utah. Completed plans call for the renovation of a transportation facility.

The Utah Transit Authority seeks a source to provide fabrication and installation of sixteen public transit handrails and forty guardrails, including removal and disposal of the old rails for seven TRAX stations. All correspondence during RFP must be directed through the Contract Administrator. Brent Miller 669 West 200 South Salt Lake City, Utah 84101 (801) 287-3009 brmiller@rideuta.com Deadline to Submit Questions and Request for Approved Equals or Changes to UTA May 26, 2026, 2:00 pm MDT Questions and Requests for changes to the RFP must be submitted via the Euna Q&A page before the end of the Question and Answer period Service Site Locations (7) Handrail Qtys (16) Guardrails w/ Mesh Qty (40) Salt Lake Central 330 S 600 W 4ea 12ea (3ea/High Block) Old Greek Town 554 W 200 S 2ea 6ea (3ea/High Block) Planetarium 150 S 400 W 2ea 6ea (3ea/High Block) Temple Square 155 W S Templ 2ea (1ea Extended/HB) 4ea (2ea/High Block) Gallivan 255 S Main St 2ea (1ea Extended/HB) 4ea (2ea/High Block) City Center 55 S Main St 2ea (1ea Extended/HB) 4ea (2ea/High Block) Courthouse 450 S Main St 2ea (1ea Extended/HB) 4ea (2ea/High Block) The Contractor will be required to have in place, furnish and provide: o Barricades and Signage: Public access around the work areas will be required during the service period. Contract will provide temporary safety barricades and signage to quartan off the immediate work areas for site location(s) City Center, or as requested by UTA's Project Manager. o Permits: any required permits to perform services i.e. demolition, installation, or regulatory. o Demolition: Removal (Demo) and disposal (Haul-Off) of existing site handrails (~16ea) and guardrails (~40ea), cutting existing railing flush to the concrete. o Field Measurements: Verify all dimensions on-site prior to fabrication to ensure accuracy. Contractor will be responsible for obtaining all measurements and dimensions to fabricate 6 builds of all handrails and guardrails. (UTA does not have drawing, measurements or dimensions) o Shop Drawings: Submit shop drawings showing locations, fittings, connections, and anchorage for approval by UTA's Project Manager before fabrication. (To be provided to UTA by the Contractor after notification of intent to award) o Provide manufacturer specifications for handrail and guardrail materials and coating systems. o Fabrication: Fabricate handrails and guardrails with continuous, smooth, and graspable surfaces. Mounting side anchor plates and flat base plates will be used to replace any sections of handrails or guardrails that are currently set in concrete. o Installation: Install new railings in accordance with approved drawings and code. Contract to specify its installation method, to be submitted as part of its technical proposal. o Site Cleanup: Remove and disposal (Haul-Off) all packaging, debris, and existing materials from the project site.

GC Bidding

Transportation Terminals

$300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
113
Bidding Soon
1,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2026

July 25, 2026

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.