BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in New Auburn, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Site: 22ND STREET FROM 195TH AVENUE NORTH TO HWY 64. Project Length: 5,227 ft. Lift to road: 1¼" base course, approximately 5,227 linear feet x 24' at 4" base course to be delivered and graded out level prior to grinding. Samples will be taken randomly and tested. Samples must meet gradation specifications, if not contractor pays for testing. Final tons to be determined by weight tickets delivered to the job site. Project to be completed October 1, 2026. Grinding: To grind existing asphalt in place. Price to include rough grading behind grinding and rolling. Distance to be grinded: Approximately 5,227 ft. Asphalt Paving: To final grading water and compact base course. To pave with 4LT, 58-28S, hot mix asphalt to an average compacted thickness of 2.50" in depth. All driveways will be wing out with asphalt. Use of two (2) pavers. Distance to be paved length is approximately 5,227 ft. x laid width 20 ft. Final tons to be determined by weight tickets delivered to job site. Graveling Shoulders: Place 3/4" base course for a minimum of a 2 ft. shoulder on both sides of the road at the same level as finished asphalt. Shoulders will be graded and compacted. Loose gravel swept off of asphalt. Distance to be shouldered: 5,227 ft. Project must be completed within 30 days after asphalt paving was finished. Final tons to be determined by weight tickets delivered to job site. Bids must be returned by May 28th, 2026. The township reserves the right to reject any and all bids or parts thereof and to waive any informalities therein, and further reserves the right to award the contract in the best interest of the Town of Auburn. No bids will be accepted after 3:00 p.m. on Thursday, May 28th, 2026. This is a LRIP funded project. Certificate of Insurance required. The contractor shall notify the Town Chairman 24-hours prior to the start of any work. Hours of work must comply with town ordinances.

Sub-Bidding

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
52
Bidding Soon
519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 12, 2026

Project location map

22nd Street from 195th Avenue North to Hwy 64, New Auburn, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.