Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a municipal facility in Hopkinton, Massachusetts. Completed plans call for site work for a municipal facility.

The Town of Hopkinton is seeking qualified contractors to extend the existing Town Common irrigation system to service three additional areas: The bump-out at the corner of Hayden Rowe Street and Marathon Way ("Bump Out") The grass strip between the granite edge on the north side of the Common and the sidewalk between Ash Street and Hayden Rowe Street ("Grass Strip") Doughboy Island across Marathon Way from the Common ("Doughboy Island") The contractor shall connect to the existing irrigation system using Hunter brand products for compatibility. The existing controller (25 active zones serving 78 heads and one fountain) will need to be expanded and programmed to support new zones. All existing zones are full. The contractor shall bore beneath the sidewalk to access the Bump Out and utilize existing conduits beneath Marathon Way to access Doughboy Island. Conduits shall be located and exposed by the contractor. The contractor shall install one (1) above ground hose spigot on Doughboy Island. This project is subject to prevailing wage requirements. Quantities are provided for general reference only and are not guaranteed. The contractor shall determine actual quantities and provide a lump sum price for all labor, materials, and equipment required. Install approximately six (6) new zones Install approximately six (6) new Hunter zone valves Install approximately thirty-five (35) Hunter Pro sprays with MP rotator nozzles Install approximately fifteen (15) Hunter I-20 Rotors Install one (1) above ground hose spigot on Doughboy Island Bore under sidewalk to the Bump Out Utilize existing conduits under Marathon Way Connect to the existing irrigation controller and electrical pannel Extend power and control wiring Expand and program controller to incorporate all new zones The contractor shall restore all disturbed areas to equal or better condition, including regrading, loam, and seeding. Question Deadline 05/21/2026 at 5:00 PM ET

Award

Municipal

$8,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
910
Active Projects
441
Bidding Soon
6,109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2026

June 26, 2026

Project location map

Multiple Locations, Hopkinton, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed