Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 16, 2026
Site work, paving and outdoor lighting for a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000322232 D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 - Public Works Funded Work (b) Part 2 - Water and Waste Funded work Part 1 - Public Works Funded Work D2.2 Part 1 - Public Works Funded Work shall consist of: (a) Concrete Reconstruction (i) Sargent Avenue from Balmoral Street to Edmonton Street (b) Pavement Rehabilitation (i) Edmonton Street from Ellice Avenue to Cumberland Avenue (c) Street Lighting Installation and Associated Works (i) Sargent Avenue from Balmoral Street to Edmonton Street (d) Traffic Signal Conduit and Base Installation and Associated Works (i) Sargent Avenue from Balmoral Street to Edmonton Street Part 2 - Water and Waste Funded Work D2.3 Part 2 - Water and Waste Funded Work shall consist of: (a) Manhole Repairs (i) Sargent Avenue - Replace Risers and Repair Benching (MH20015221) (ii) Sargent Avenue - Grout Manhole Walls and Repair Benching (MH20015180) (iii) Sargent Avenue - Abandon Flush Tank Chamber and Replace with New Manhole (MH20015225) (iv) Edmonton Street - Replace Risers (MH20015179) (v) Edmonton Street - Manhole Replacement (MH20015237) (b) Water Service Installation (i) Sargent Avenue D2.4 The City currently has no approved funding in the Capital Budget for Part 2 of the Work but is anticipating receiving notification about funding from the City of Winnipeg Water and Waste Department by late May. Part 2 of the Work are contingent upon the City of Winnipeg Water and Waste Department approving sufficient funding. D2.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced accordingly. D2.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D2.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5. D2.4.3 If all or any portion of Part 2 is eliminated pursuant to D2.4.1, the time periods stipulated in D19 for Substantial Performance of the Work and in D20 for Total Performance of the Work will be reduced proportionally by the Contract Administrator acting reasonably. D2.5 The major components of the Work are as follows: (a) Concrete Reconstruction (Sargent Avenue) (i) Installation of catch pits and drainage connection pipe (ii) Installation of catch basins c/w subdrains and sewer service pipe (iii) Removal of existing trees and planter boxes (iv) Removal of existing asphalt/concrete pavement (v) Removal of paving stones on roadway and sidewalks (vi) Excavation and subgrade preparation (vii) Insulation of water services (viii) Place separation/filtration geotextile fabric and geogrid (ix) Place Granular A limestone sub-base and base course granular layers (x) Construct 250mm plain dowelled concrete pavement (slip-form and hand placement) (xi) Construct 200mm reinforced concrete approaches with Type "A" bar mat (xii) Construct barrier curb, modified barrier curb and curb ramp (xiii) Installation of structural soil cells (xiv) Construct monolithic curb and 100mm sidewalk with block outs (xv) Construct 100mm sidewalk with block outs (xvi) Construct 150mm reinforced sidewalk with block outs (xvii) Installation of paving bands (xviii) Place asphalt for tie-ins where necessary (xix) Adjustment of manholes (xx) Restoration of boulevards (b) Pavement Rehabilitation (Edmonton Street) (i) Planing of existing asphalt pavement (ii) Abandoning existing catch pits and catch basins (iii) Installation of new catch basins and sewer service pipe (iv) Renewal of miscellaneous pavement slabs (200mm reinforced concrete pavement) (v) Renewal of existing barrier curb (100mm reveal height), modified barrier curb (150mm reveal height) and curb ramp (vi) Renewal of existing sidewalks c/w detectable warning tiles as required (vii) Adjustment of catch basins and manholes (viii) Installation of pavement repair fabric at various locations (ix) Construction of new asphalt overlay (80mm average thickness) (x) Restoration of boulevards Questions are submitted online No Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
GC Bidding
Roads / Highways
$600,000.00
Public - City
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2026
June 26, 2026
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jun 04 2026
Winnipeg, MB
Bid Date: Jun 04 2026
Winnipeg, MB
Bid Date: May 15 2026
Winnipeg, MB
Bid Date: May 21 2026
Winnipeg, MB
Bid Date: May 29 2026
Winnipeg, MB
Bid Date: May 27 2026
Winnipeg, MB
Bid Date: Jun 04 2026
Winnipeg, MB
Bid Date: May 28 2026
Winnipeg, MB
Bid Date: May 15 2026
Winnipeg, MB
Bid Date: May 29 2026
Winnipeg, MB
Bid Date: May 08 2026
Winnipeg, MB
Bid Date: May 08 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 14 2026
Winnipeg, MB
Bid Date: May 21 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
