BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2026 at 8:00 PM

Updated June 11, 2026

Site work for a road / highway in College Station, Texas. Completed plans call for site work for a road / highway.

This project consists of the widening of State Highway 6 at the Brethren Church overhead crossing. Question Deadline 05/21/2026 at 2:00 PM CT Questions and inquiries about this bid should be submitted in writing via the Q&A feature available online via the Brazos Valley e-Marketplace (bidding portal). SH 6 Widening - Brethren Church OH Crossing The project is to replace the existing 12.5 kV, 477 AAC, three-phase overhead powerline crossing SH 6 with a new overhead crossing using Hendrix wire. The intent is to retain the circuit crossing SH 6 at this location but remove the two poles currently in TxDOT right-of-way. This will be accomplished in two significant portions. The project is located crossing SH 6, also known as S Earl Rudder Freeway, between Harvey Mitchell (FM 2818) and the TX-6 business route / SH 6 interchange. This crossing is near the Brethren Church and Crystal Park Plaza buildings along the highway. a. New OH Crossing Beginning on the west side of SH 6, a new overhead line will be extended acrossthe highway. This will be a compact construction utilizing Hendrix spacer cable systems. It will include one (1) 65' concrete pole and one (1) 70' concrete pole for a total of two (2) new poles. The 65' pole will replace the existing pole on the east side of the highway. At both locations, new guys and anchors shall be installed. Approximately 543 linear feet of (1) 127 AWA along with 1,629 feet of 636 AAC (3x 543') will be installed with cable spacers at approximately 8' increments. All primary and neutral connections will transfer to the new poles. Two (2) communication attachments will transfer to the poles on either side of SH 6. COCS construction specifications included in this bid shall be used for this work. All digging for the new poles to be set, and all pulling of wire shall be included. Retire units are called out in the staking sheets. The concrete poles are estimated to weigh between 10,000 -15,000 pounds each. This project is in a commercial area. Hendrix spacer cable will be installed across SH 6. Prior to installation contractor shall contact Marmon Utility, LLC to schedule an on-site visit. A Marmon Utility representative will provide educational guidance for system installation. Retire OH Crossing Beginning on the west side of SH 6, an existing overhead line crossing SH 6 will be removed. It will include removal of one (1) existing 55' fiberglass and one (1) existing 50' steel poles. Approximately 2,184 feet of existing three-phase, 477 AAC will be retired across three (3) spans. One (1) gang operated air-break switch will be removed. COCS construction specifications included in this bid shall be used for this work. All removal units shall be called out in the staking sheets. This project is in a commercial area. This project will require a traffic control plan. The contractor will be required to coordinate with TxDOT for permitting and scheduling. As part of the design process an application has been submitted in TxDOT RULIS. See Appendix C for additional information. The permit application number is 00002/2026 permit application This project will be further described in the construction drawings and staking sheets, and all work is to be performed on energized lines

Post-Bid

Roads / Highways

$500,000.00

Public - City

Site Work

3

12

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
257
Bidding Soon
4,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

July 3, 2026

Project location map

Hwy 6, College Station, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.