BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2026 at 8:00 PM

Updated June 5, 2026

Site work and paving for a clubhouse / community center in Sauk Centre, Minnesota. Completed plans call for site work for a clubhouse / community center; and for paving for a clubhouse / community center.

As of June 03, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. Bids are being accepted for a reclamation and paving project involving approximately 2,656 square yards of bituminous parking lot at the Sauk Centre Senior Center. A bid bond or cashier's check equal to 5% of the bid is required and must be submitted with the bid. The City reserves the right to reject any or all bids, waive any irregularities, and to increase or decrease the scope of the project due to budget considerations at the same unit price. No bid may be withdrawn for a period of twenty days after bid opening. The scope of this project is to complete a full depth reclamation and overlay of the Senior Centre Parking Lot located at 321 4th St N, Sauk Centre, MN. Full depth reclamation and paving approximately 2,656 SQ Yards of bituminous roadway. Parking Lot- +/- 23,900 sq ft (2,656 sq yards) of bituminous parking lot Existing curb is to stay in place and bituminous shall be placed up to existing curb after milling, except areas that are marked. Finished parking lot shall have proper slope to facilitate drainage of the parking lot to the curbline. Excess millings will be the responsibility of the contractor to remove; there is a dump site at the public works building 6 blocks away for the excess millings to be hauled to. Prep grading and compaction for the pavement will be the responsibility of the paving contractor and shall be included in the pavement estimates. Soil correction will be required on the east side of the building, approximately 10’x10’x12” deep in the bad area. The south west corner of the parking lot will require regrading and curb removal to get the water drainage to improve. Approximate area 24 feet x 24 feet, elevation needs to be brought up 0.4ft +/-. Final grade to be determined with contractor. Excess millings to be used for this elevation change. Surmountable curb to be removed and reinstalled, approximately 50 feet. Contractor to provide weight slips of each load of asphalt for the project. Line striping to be completed by the City of Sauk Centre. Contractor is responsible to properly adjust all manholes prior to final lift of asphalt being applied. See project map and layout for full description. Project Supervisor: Ben Clink Public Works Supervisor 320-249-7609

Bid Results

Clubhouse / Community Centers

$75,923.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
67
Bidding Soon
888
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

June 29, 2026

Project location map

321 4th St N, Sauk Centre, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.