Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Pittsburgh, Pennsylvania. Completed plans call for site work for a water / sewer project.

Pittsburgh Water is requesting... (document does not provide further visible information on the scope of work or instructions to bidders). Pittsburgh Water's water distribution system consists of three separate supersystems. One of which is the Highland Reservoir No. 2, which supplies water to the Strip District, Downtown, and the Southside Flats by way of two large transmission mains, a 54-in supply main that conveys water directly toward the Southside Flats (known as the Saline Supply Main), and a 50-in transmission main that runs through the Pittsburgh Zoo parking lot and the neighborhood of Morningside before separating into two separate transmission mains on Butler Street that feed directly into the distribution system. This 50-in transmission main was rated the eighth most critical transmission main in the entire system as its failure would have a significant impact on the system. This project will include the leak detection survey and rehabilitation of this transmission main by Carbon Fiber Reinforced Polymer (CFRP) lining and/or partial replacement. There is currently one suspected leak on this main in the area immediately below Highland Reservoir No. 2 in the Pittsburgh Zoo Parking Lot. In addition, there are two additional transmission mains that we are seeking to perform leak detection and limited condition assessment on, in order to guide future rehabilitation projects these mains are: the upper section of the Lanpher Supply Main (60-in main from Lanpher Reservoir to Lincoln Avenue in Millvale), and the Saline Supply Main and River Crossing (50-in main from Highland Reservoir No. 2 to Sidney Street in the Southside Flats neighborhood). Questions Due Date: Jun 11th 2026, 4:00 PM EDT Details: This RFP will be administered by Felicia Mazza, Procurement Specialist. All questions pertaining to this RFP prior to selection shall be submitted via the Procurement software tool. Questions are due no Contact: Felicia Mazza Submission Method: Procurement software tool It is therefore the current goal of Pittsburgh Water to encourage increased MBE, WBE, SBE, VBE, DOBE, LGBTBE participation in all business pools. Pittsburgh Water 's current supplier diversity goal is between ten percent (10%) and twenty-five percent (25%). Pittsburgh Water intends to monitor progress closely, including revising the practices and procedures from time to time as conditions warrant.

GC Bidding

Water / Sewer

$5,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
169
Bidding Soon
2,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

August 17, 2026

Project location map

Multiple Locations, Pittsburgh, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.