Site work for a power facility in Grand Junction, Iowa. Completed plans call for site work for a power facility.

Furnish labor and materials for the construction of a new 69 kV substation. The location of the project site is as follows: Substation 308 11th Street S Grand Junction, IA 50107 A construction unit consists of furnishing and installing steel structures complete with equipment mounting bolts, equipment-mounting brackets and supports, and supplying and installing ground clamps, all conduit mounted on or attached to the steel structures including all fittings and couplers, and connectors necessary to attach the equipment to the structure. Unit includes furnishing and installing anchor bolts. Specific construction units are as follows: A1 Steel, 69 kV H-frame deadend structure (ea.) A2 Steel, shield support pole (ea.) A3 Steel, PT stand (ea.) SWITCHES: A construction unit consists of furnishing and installing 3- phase, 69 kV group-operated air-break (GOAB) switches with accessories, operating mechanisms, and identification signs. A separate unit includes furnishing and installing single phase 69 kV fused disconnect switches with accessories, fuse, operating mechanisms, and identification signs. The Contractor shall furnish and install mounting bolts and miscellaneous hardware materials for complete installation. Specific construction units are as follows: B1 Switch, 69 kV, 3Ø, vertical break, GOAB, on H-frame steel (ea.) B2 Fused hookstick switch, Porcelain, Right-Angle, 69 kV, 1Ø, with insulators, fuse links, and hardware, installed on deadend H-frame (ea.) LIGHTNING ARRESTERS: A construction unit consists of furnishing and installing station class lightning arresters mounted in place and connected to the ground conductor and grid. Specific units are as follows: C1 Lightning arrester, 22 kV, 1Ø, 27 kV duty cycle,station class(ea.) C2 Lightning arrester, 48 kV, 1Ø, 60 kV duty cycle,station class(ea.) BUS WORK: A construction unit consists of furnishing and installing all tubular bus conductor, strain bus conductors, insulators, flexible cable bus conductor, connectors, fittings, end caps, identifications signs, vibration damping conductor, and clamps regardless of size or type. Units include drilling, welding and field bending as required. Specific construction units are as follows: D1 Bus work, jumpers, insulators, connectors, dampening cables (as req'd.) Question Deadline 06/04/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Power Plant

$4,000,000.00

Public - City

Site Work

43

18

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
64
Bidding Soon
997
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

July 15, 2026

Project location map

306 11th St S, Grand Junction, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.