BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 29, 2026

Site work and new construction of a mixed-use development in Clinton, Massachusetts. Completed plans call for the construction of a bridge / tunnel; and playground / park / athletic field.

The project consists of construction of approximately 3,670 linear feet of multi-use trail including clearing, grading, an 8-foot-wide stone dust path, trailhead parking improvements at Rauscher Farm and Woodland Circle, a pedestrian footbridge, and a supported boardwalk through wetland areas. This includes all associated drainage, erosion controls, and environmental monitoring in accordance with OOC (DEP File No. 135-0297). Bonds: 5% Bid Bond, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 05/22/2026 at 12:00 PM ET Via email only to: eford@parecorp.com. Clearly label questions by using the following subject line: QUESTION - CONSTRUCTION OF THE MCRT, TOWN OF CLINTON PORTION Work will consist of the excavation and grading of the proposed trail surface and installation of stormwater drainage swales on the trail shoulders. Minimal vegetation clearing will be required for access to the two (2) major points which will be part of this scope of work; Rauscher Farm Trailhead and 447 Berlin Street Trailhead. The specifics to the scope will include: o Sedimentation control o Tree removal, tree trimming, and tree protection o Rock excavation o Clearing, grubbing, grading and compaction for Trailheads o New Parking area construction at Paddock (Rauscher Farm) o New Footbridge Installation near Paddock trailhead o Stone Dust trails connecting trailheads to rail bed o New Boardwalk for wetland crossing near Berlin Town Line o Environmental compliance (ongoing) Sedimentation control, wetland permitting requirements and any rare species habitat review The CONTRACT shall be substantially complete by May 31, 2027 with final completion to occur by June 30, 2027.

GC Bidding

Playgrounds / Parks / Athletic Fields

$1,371,700.00

Public - City

New Construction, Site Work

58

11

2

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
906
Active Projects
554
Bidding Soon
5,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2026

July 18, 2026

Project location map

Multiple Locations, Clinton, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.