BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work and renovation of a water / sewer project in Honolulu, Hawaii. Completed plans call for the renovation of a water / sewer project.

The estimated construction cost is between $500,000 to $1,500,000. Contractor shall furnish all labor, tools, materials, equipment, and incidentals necessary to complete the following scope of work. The work shall include, but is not limited to, the following a. Remove and dispose of the existing primary metering switchgear and associated conduits, wiring, and appurtenances. b. Furnish and install new outdoor primary metering switchgear. Work shall include installation of the medium-voltage primary metering switchgear assembly and concrete pad. c. Provide excavation, trenching, sawcutting, conduit installation, backfill, and pavement restoration as required for installation of new conduit and wiring associated with the switchgear installation. d. Protect existing adjacent equipment, structures, and utilities as necessary during demolition and installation work. e. Coordinate all work with HECO, including but not limited to: utility switching, scheduled outages, cable terminations, equipment inspections, and final energization. f. Sequence the work to minimize disruption to facility operations. The existing switchgear shall remain operational until the new switchgear is installed, tested, and accepted by HECO and BWS. g. Provide testing and commissioning of the new primary metering switchgear assembly. h. All work shall be installed in accordance with manufacturer recommendations, applicable codes and standards, and HECO requirements. Improvements and repairs to Aina Koa Booster Stations including replacement of primary metering switchgear. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$1,500,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
46
Bidding Soon
377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2026

July 25, 2026

Project location map

To be Determined, Honolulu, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.