BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and new construction of a water / sewer project in Fernandina Beach, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The City of Fernandina Beach, Florida is accepting competitive sealed bids for Fernandina Beach Marina Redevelopment. Submittals must be uploaded to Demandstar.com E-bidding System. Submittals will not be considered from any firm that is not represented at the Mandatory Pre-bid meeting. Any bidder who arrives after the meeting has commenced will not be considered. Vendors should submit responses through the DemandStar website. Vendors who obtain ITBs, RFPs and RFQs from a source other than DemandStar are cautioned that the information may be incomplete. Questions regarding the ITB requirements or process must be directed in writing. 1 S FRONT ST, FERNANDINA BEACH, FL 32034 Question Deadline 06/17/2026 at 5:00 PM ET Questions regarding the ITB requirements or process can be directed in writing to Wanda Weaks, Purchasing Specialist at wweaks@fbfl.org The City of Fernandina Beach Riverfront Resiliency Project is the continuation to protect Historic Downtown Fernandina Beach from Blue Sky Tide Flooding, Sea-level Rise, and Storm Surges. Fernandina Beach Marina Redevelopment consist of the following. The demolition of Brett's Waterway Cafe and the removal of debris falling into the river; dredging; a new pier is to be constructed to have the entrance be more in align with Center Street with a single entrance to the marina including improved site views. The location of the pier will allow the construction of the new pier to occur while the existing pier remains open. Then the demolition of the existing timber pier and reconnecting of floating docks "E" and "F". Also, the proposed project will consist of a new concrete bulkhead and wooden boardwalk constructed over the water to replace the existing boardwalk and failing bulkhead under Brett's. The new bulkhead appearance and finish to match phase one of the Fernandina Beac

GC Bidding

Water / Sewer

$5,000,000.00

Public - City

New Construction, Site Work

153

18

5

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
55
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 31, 2026

Project location map

204 Ash St, Fernandina Beach, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.