BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 10, 2026

Site work and new construction of a playground / park / athletic field in Cannon Falls, Minnesota. Completed plans call for the construction of a 3,500-square-foot playground / park / athletic field; and for site work for a playground / park / athletic field.

Scope: This project will construct a new 3,500sf storm shelter and restroom building within Lake Byllesby Regional Park. This building will provide shelter for 500 individuals in the event of severe weather. The building is a pre-cast structure with one large open room and three restrooms. A well and septic system are included within this project scope. Ancillary work to support the replacement is a part of this project. Plans: See plan room. Please providde a Base Bid and the following alternates: ADD ALTERNATE #1 - PROVIDE 6 ADDITIONAL SOLAR TUBES ADD ALTERNATE #2 - PROVIDE LIMITED TEMPERING AT TOILET ROOMS AND MECHANICAL ROOMS ADD ALTERNATE #3 - PROVIDE 20' +/- SLAB ALONG SOUTH FACADE ADD ALTERNATE #4 - PROVIDE ADDITIONAL DOORS IN SOUTH FACADE Other Info: Prevailing Wages are required. Work to begin in August 2026 and complete April 2027 All questionsregarding this project will be directed to the attention of Christina Lundgren, Sr Project Manager at christina.lundgren@co.dakota.mn.us. Questions are due by end of day on May 26, 2026. The final addendum will be issued June 1, 2026. Where indicated in the attached documents, submittals will be made directly to the Project Manager SCOPE OF WORK: 25.1 General Scope: The attached specifications provide a minimum acceptable standard required by the Owner. Base Bid is for all work shown on the contract drawings and referenced in the Bid Documents including but not limited to earthwork, grading, concrete, steelwork, roofing, mechanical, electrical and special fire and security systems. 25.2 Work included: Provide all labor, materials, articles, equipment, incidentals, items, tools, services, methods, operations, skills in such quantities as may be necessary to complete the project within intent of the Contract Documents. 25.3 All work shall be completed in compliance with the latest edition of the prevailing fire prevention and building codes in effect in the State of Minnesota at the specified site. Manufacturer's specifications and instructions for specified products or approved equals become part of these specifications and all such instructions are to be followed accordingly

Post-Bid

Playgrounds / Parks / Athletic Fields

$2,300,000.00

Public - County

New Construction, Site Work

39

27

11

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
107
Bidding Soon
2,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

August 8, 2026

Project location map

8150 295th St E, Cannon Falls, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.