Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a water / sewer project in Port Saint Lucie, Florida. Completed plans call for site work for a water / sewer project.

The City of Port St. Lucie (City) provides wastewater collection and transmission services to customers within their service area via a network of lift stations and pressurized force mains that pump wastewater to either the Westport Wastewater Treatment Facility or the Glades Wastewater Treatment Facility. The primary function of the pump station is to transfer flow from upstream lift stations to the Glades Wastewater Treatment Facility (WWTF). This collection and transmission system includes several in-line booster pump stations, including the Northport Booster Pump Station. This project is needed to install flow meters and pigging stations. The contractor will be responsible for the installation of new force main connection on the existing suction and discharge sections of the Northport In-Line Booster Pump Station headers, including new flow meter assemblies and pigging stations. This project includes the installation of new 24-inch force manifold including fittings and valves future connections. This connection is located on the suction side of the booster pump station and will require a coordinated, temporary shutdown. This project also includes new 24-inch force main and 16-inch force main both located on the discharge side of the booster pump station. These force mains each include a stand-alone flow meter. The existing pigging station and containment will be removed and replaced with two new pigging entry ports to serve the 24-inch force main and the 16-inch force main. Also included in this project are all fittings, valves, appurtenances, pipe associated, connections to force mains, testing, magnetic flow meter installation and connection to PSL SCADA and associated demolition. Improvements to the Northport In-Line Booster Pump Station. Question Deadline 06/08/2026 at 5:00 PM ET All questions concerning this IFB must be submitted in writing on online. Question Response Deadline: June 16, 2026, 5:00pm

GC Bidding

Water / Sewer

Public - City

Site Work

14

21

8

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
62
Bidding Soon
1,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

August 8, 2026

Project location map

281 NW St James Dr, Port Saint Lucie, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.