Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work for a water / sewer project in Port Saint Lucie, Florida. Completed plans call for site work for a water / sewer project.
The City of Port St. Lucie (City) provides wastewater collection and transmission services to customers within their service area via a network of lift stations and pressurized force mains that pump wastewater to either the Westport Wastewater Treatment Facility or the Glades Wastewater Treatment Facility. The primary function of the pump station is to transfer flow from upstream lift stations to the Glades Wastewater Treatment Facility (WWTF). This collection and transmission system includes several in-line booster pump stations, including the Northport Booster Pump Station. This project is needed to install flow meters and pigging stations. The contractor will be responsible for the installation of new force main connection on the existing suction and discharge sections of the Northport In-Line Booster Pump Station headers, including new flow meter assemblies and pigging stations. This project includes the installation of new 24-inch force manifold including fittings and valves future connections. This connection is located on the suction side of the booster pump station and will require a coordinated, temporary shutdown. This project also includes new 24-inch force main and 16-inch force main both located on the discharge side of the booster pump station. These force mains each include a stand-alone flow meter. The existing pigging station and containment will be removed and replaced with two new pigging entry ports to serve the 24-inch force main and the 16-inch force main. Also included in this project are all fittings, valves, appurtenances, pipe associated, connections to force mains, testing, magnetic flow meter installation and connection to PSL SCADA and associated demolition. Improvements to the Northport In-Line Booster Pump Station. Question Deadline 06/08/2026 at 5:00 PM ET All questions concerning this IFB must be submitted in writing on online. Question Response Deadline: June 16, 2026, 5:00pm
GC Bidding
Water / Sewer
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2026
August 8, 2026
281 NW St James Dr, Port Saint Lucie, FL
Related To This Project
Port Saint Lucie, FL
Bid Date: May 25 2026
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: Jul 08 2026
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: Jun 30 2026
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: May 25 2026
Port Saint Lucie, FL
Bid Date: May 26 2026
Port Saint Lucie, FL
Bid Date: Apr 30 2026
Port Saint Lucie, FL
Bid Date: Apr 29 2026
Port Saint Lucie, FL
Bid Date: Jun 18 2026
Port Saint Lucie, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
