BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2026 at 8:00 PM

Updated May 24, 2026

Renovation of a municipal facility in Milford, Connecticut. Completed plans call for the renovation of a municipal facility.

The scope of work includes improvements at Parsons Government Center involving (1) HVAC upgrades and (2) boiler replacement. Bidders are required to check for current information and applicable addenda before submitting a bid. A Bid Bond of 5% for the total base bid is required with each bid. The successful bidder must provide a 100% Performance Bond, a 100% Labor and Materials Bond, and a Certificate of Insurance upon award. Bidders must adhere to conditions of employment, minimum state wage rates per Conn. Gen. Stat. 31-53, and payroll submission requirements. This project is funded by the American Rescue Plan Act (ARPA) and all ARPA regulations apply. The City reserves the right to reject any or all bids or waive defects or informalities as deemed in the City's best interest.

Sub-Bidding

Municipal

$800,000.00

Public - City

Renovation

17

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,027
Active Projects
574
Bidding Soon
7,813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.