BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2026 at 8:00 PM

Updated June 5, 2026

Site work and new construction of a mixed-use development in Bellingham, Massachusetts. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Memorial Middle School sewer improvements including the installation of approximately 230 feet of new 8-inch gravity sewer main with two manholes, connecting to two existing 6-inch live sewer pipes, and connecting to an existing sewer manhole. Scope also includes saw cutting pavement, hot mix asphalt patching, and loam and seeding of disturbed lawn areas. Bonds: 5% Bid Bond, 100% Payment Bond, 100% Performance Bond.

Post-Bid

Educational

$1,500,000.00

Public - City

New Construction, Site Work

3

12

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

August 7, 2026

Project location map

130 Blackstone St, Bellingham, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.