Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of a mixed-use development in California, Missouri. Completed plans call for the renovation of a educational facility.

The scope of work includes flooring projects in the high school, as well as abatement and flooring projects in the middle school and elementary school buildings. Interested parties are required to schedule a mandatory individual pre-bid meeting. Bids must be submitted by the specified deadline. For access to bid documents and to set up a pre-bid meeting, parties must follow the provided instructions. Direct all inquiries concerning this RFP to: Derek Scroggins 573-796-2145 Derek.scroggins@californiak12.org The Moniteau Co. R-I School District is issuing this Request for Proposal to have flooring redone in parts of California Elementary, California Middle and California High School buildings. Below is a breakdown of what will be done at each location: California Elementary 101 S. Owen St. California, MO 65018 Abatement, prep and supply/install replacement of VCT floor for approximately 8,760 sq ft in the following areas: Nurse's office (including bathroom & storage space), Kitchen area and Cafeteria Demo, prep and supply/install replacement VCT floor for approximately 1,300 sq ft in the hallway between the cafeteria and the multi-purpose room and supply/replace approximately 32 stair treads on the two stair cases going from this hall to the MPR. Remove, supply and install approximately 840 ft of cove base. California Middle School 211 S. Owen St. California, MO 65018 Abatement, prep and supply/install replacement of VCT floor for approximately 3,326 sq ft in the following areas: the upstairs hallway going from the band room hallway/side building entrance by the nurse's office to the threshold by the main stairs, the landing of the main stairs, and the hallway on the lower floor going from the main stairs to the exterior doors by the girls locker room entrance. Remove, supply and install approximately 720 ft of 6" cove base. Supply/replace approximately 20 stair treads on the main stairs. Remove, supply and install 136 sq ft of rubber tile on ramp near upstairs main bathroom. California High School 1501 W. Buchanan St. California, MO 65018 Demo carpet in the band room, library/media rooms. Supply/install approximately 624 yards of carpet in the library/media rooms. Supply and install approximately 2,147 sq ft of VCT flooring in the band room. Remove, supply and install approximately 1,200 ft of 6", 4.5", and 4" cove base to match existing base.

Award

Educational

$221,451.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
59
Bidding Soon
693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2026

July 28, 2026

Project location map

Multiple Locations, California, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed