BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work and new construction of a mixed-use development in Garden City, Utah. Completed plans call for the construction of a one-story above grade municipal facility; for site work for a municipal facility; and water / sewer project.

This is an advertisement for a procurement opportunity for Whitaker Construction for the Bear Lake Marina Expansion Project - Fee Station and Restroom Building. The project involves the construction of a new single-story entry fee station building which will contain a staff office and an accessible unisex restroom. Additionally, a new single-story public restroom building will be constructed, which will include men's and women's restrooms, multiple showers, a janitor closet, and a utility room. All responses must be directed to the designated individual or office as listed in the Invitation to Bid. It is the responsibility of the vendor to review the entire solicitation to comply with any requirements. The Bear Lake Marina Expansion Project involves construction of a new marina facility in Garden City, Utah. The overall project includes a new marina, site improvements, utilities, and associated infrastructure. The Fee Station and Restroom Building were deferred from the original project due to budget constraints; separate funding has since been secured and this work package is now being procured as a stand-alone bid. This Bid Package is a stand-alone scope for the complete construction of two (2) new buildings: o Bid Package BP-1 - Fee Station (small entry fee station building with office and unisex restroom) o Bid Package BP-2 - Restroom Building (multi-user restroom building with men's and women's restrooms, showers, and support spaces) Bidders must review the full Permit Set of Construction Documents (Cirque Studio Architects / Kimley-Horn, September 9, 2024, including Addendum 01) in their entirety. All work shall be performed in accordance with the 2021 Utah Building Code (2021 IBC) Questions shall be directed in writing to: Cole Fronk- Whitaker Construction Company cole.fronk@whitcon.com | 435-723-2921 Notice to Proceed Spring 2027 Substantial Completion Fall 2027

GC Bidding

Municipal

$2,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
28
Bidding Soon
415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

April 6, 2027

Project location map

To Be Determined, Garden City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.