BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of a stadium in Fairmont, West Virginia. Completed plans call for the renovation of a stadium.

Sealed bids are requested from qualified vendors to replace the digital scoreboards with LED videoboards at East-West Stadium, 10 Virginia Avenue, Fairmont, WV 26554 and Woodcutters Stadium (North Marion High School), 1 N Marion Drive, Farmington, WV 26571. Marion County Schools reserves the right to reject any and/or all proposals, to reject or accept any and/or all items in a proposal, and to award the contract in whole or in part as deemed to be in the best interest of Marion County Schools. Questions , please call Dr. Donna Heston , Chad Norman , Scott Reider at 1.304.367.2100 Requesting a bid for the replacement of the Score Board at East / West Stadium . Score board would be relocated to the end zone opposite the endzone entrance . 2. Overall size of the board is required to be determined by contractor recommendation . 3. SM Infinity Software (Cloud ware for digital advertising ) compatible with safety and security upgrades with Centegix for public service announcements , and Homeland Security Notifications Systems is required and or comparable software system . 4. Training and support for the approved software program is required . Twice monthly for 24 months as required . 5. The video board display is required to be at least 10ft . in height by 18ft . in width . 6. The new sign will include framing and custom designs and lettering as approved by East Fairmont High School and Fairmont Senior High School . 7. Scoreboard will be required to keep statistics for Soccer , Lacrosse , and Football . ( Example shots on goal , saves , etc. ) Requesting a bid for the replacement of the Score Board at East / West Stadium . Score board would be relocated to the end zone opposite the endzone entrance .8. Steel Support Scoreboard Structure required while reusing the existing faux stone currently on the existing scoreboard . 9. Removal of two scoreboards and disposal of the scoreboards is to be included in the final bid

Post-Bid

Arenas / Stadiums

$400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
94
Bidding Soon
1,612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2026

July 9, 2026

Project location map

Multiple Locations, Fairmont, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.