BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 31, 2026 at 8:00 PM

Updated September 3, 2026

Site work for a power facility in Lyman, Nebraska. Completed plans call for site work for a power facility.

The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The Stegall Substation Stage 07 Phase 01 Construction Project enhances WAPAs ability to provide reliable/cost-efficient electrical power by replacing end-of-life control building, disconnect switches, and oil circuit breakers. New gas circuit breakers are on site and ready for installation by the contractor. WAPA benefits from these replacements by resolving deteriorating and potentially dangerous equipment conditions while setting up the substation for future Phase 02 conversion to breaker and a half bus configuration. The principal components of work include the following: Replace 115kV circuit breakers, 230 and 115kV disconnect switches, re-conductor 230 and 115kV main bus, construct new control building and comm tower Location: Stegall Substation Situated near Stegall Road in the unincorporated community of Stegall, NE, just north of the Colorado-Nebraska border. Directions: From Gering head south on 10th Street (Kimball Avenue) from M Street for 1.8 miles to Robidoux Road. Turn right and go 4 miles to County Road 17. Turn right and go 0.1 miles to Robidoux Road. Turn left and go 3.3 miles on Robidoux Road, turn right and continue 5 miles on Robadeuax Road to Stegall Road. Turn right and go 0.8 miles to substation on the right. Latitude: N 41 49 10 Longitude: W 103 56 37 Elevation: 4256 Datum: NAD83/WGS84 The anticipated period of performance is 800 calendar days after Notice to Proceed. The estimated magnitude of construction is Between $5M and $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. *Pre-Bid Info: Turn right and go 4 miles to County Road 17. Turn right and go 0.1 miles to Robidoux Road. Turn left and go 3.3 miles on Robidoux Road, turn right and continue 5 miles on Robadeuax Road to Stegall Road. Turn right and go 0.8 miles to substation on the right. Latitude: N 41 49' 10" Longitude: W 103 56' 37" Elevation: 4256' Datum: NAD83/WGS84 Questions and inquiries regarding this solicitation must be submitted to John Pratt (Contracting Officer), jpratt@wapa.gov, by 17 July 2026. A consolidated response/answers to questions will be posted via Amendment to this solicitation by 24 July 2026.

Post-Bid

Power Plant

$10,000,000.00

Public - Federal

Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
13
Bidding Soon
220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2026

October 29, 2026

Project location map

Stegall Rd, Lyman, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.