BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work and renovation of a water / sewer project in Santo Domingo Pueblo, New Mexico. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

PROJECT DESCRIPTION SDP owns and maintains a water system serving Pueblo residents, enterprises, and public services/agencies across four community areas: Main Village, Galisteo, Domingo, and the Enterprise Area. The Santo Domingo Pueblo consists of three distinct communities that each have their own wastewater systems. These include the Main Village, Galisteo, and Domingo. The Main Village faces significant construction constraints to be considered in the design process that include but are not limited to limited access, narrow streets, overhead utilities, and buried utilities: natural gas, fiber optic, water main and services, and sewer main and services. Most of the residential structures are constructed of adobe and are without structural foundations. Construction planning must account for potential hand-digging, vibration monitoring, resident access, coordination around cultural activities, and documentation of pre-construction conditions. It is recommended that low-vibratory practices (equipment movement and soil compaction) be used within 15 m (50 ft) of buildings, to avoid indirect impacts from ground disturbing activities. Any excavation directly adjacent to the building’s walls or foundation should be completed by hand. The Main Village collection system comprises a lift station, gravity collection system, and a force main. The gravity collection system consists of six, eight, ten, and fifteen-inch clay and PVC pipe. The structural condition of the pipe varies, with several sections of clay pipe showing cracks, root intrusion, offset joints, and blockages. This design will include replacement/rehabilitation of approximately 20,000 linear feet of sewer main, 82 manholes and 360 service connections (including all necessary valves, fittings, appurtenances, and mitigations). This replacement shall be done while maintaining the established system operations. Award of Contract June 14, 2026 (tentative) Submittal of Questions and Requests for Clarifications Should an Offeror require clarifications regarding the RFP or have questions, the Offeror shall submit those questions in writing by email to Joe Mauser, P.E., Project Offeror at joe.mauser@kewa-nsn.us

GC Bidding

Water / Sewer

$1,500,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
22
Bidding Soon
314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2026

August 13, 2026

Project location map

134 Tesuque Street, Santo Domingo Pueblo, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.