BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

Site work and new construction of an educational facility in Belton, Missouri. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The Belton School District #124 in Belton, Missouri is seeking qualifications for a construction manager at-risk (CMaR) in accordance with RSMo _ 67.5050. Qualified organizations are invited to submit eight copies of a formal proposal and one digital copy as described. Submittals must be labeled "Manager At-Risk" and submitted to the specified address. Further instructions for proposal preparation and submittal are provided within the request for qualifications. Please direct any questions to Dr. Andrew Underwood aunderwood@bsd124.org or Patrick Smith (psmith@incitedesignstudio.com). The District is requesting qualifications from firms to provide a full range of services as Construction Manager at-Risk (CMaR) during the planning, design, and construction phases for capital improvements, construction and consulting services on District facilities, and projects outlined in Appendix A. The District has retained a design firm, incite Design Studio (iDS) and their consultant team to provide architectural and engineering related services, and the CMaR will be required to work with the District and design team during the planning phase, construction documentation phases, and the construction process. Incite Design Studio (iDS) was hired to create a Masterplan for Belton School District #124. After several meetings with various stakeholder groups, below is the summary of the main components. Approximate total construction dollars for the Construction Manager at Risk contract: $33,000,000 _ Yeokum Renovation _ Press Box - Softball _ Press Box - Baseball _ Furnishing Elementary Buildings _ Road Revision (HS) _ Deferred Maintenance - Multiple Buildings & Renovating Middle School Kitchen, Middle School Gymnasium and Various Restrooms Throughout the District. _ Potentially One Multi-Use Facility

GC Bidding

Educational

$33,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
71
Bidding Soon
1,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

August 10, 2026

Project location map

To be determined, Belton, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.