Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2026 at 8:00 PM

Updated June 16, 2026

Demolition and renovation of an educational facility in Gainesville, Florida. Completed plans call for the renovation of a educational facility.

Lincoln Middle School - Partial Roof & HVAC Replacement SUMMARY OF WORK: The proposed work for the Partial Roof (1B) and HVAC Replacement - Building 01 at Lincoln Middle School is, but is not limited to, the following: Unit pricing, allowances, cutting and patching, selective structure demolition, concrete forming and accessories, concrete reinforcing, expansion and contraction joints, cast in place concrete, concrete finishing, lightweight insulating concrete, masonry mortaring and grouting, reinforced unit masonry, metal fabrications, miscellaneous rough carpentry, vapor retarders, modified bituminous membrane roofing, sheet metal flashing and trim, roof specialties, joint protection, cement plastering, painting and coating, termite control and structural, mechanical and electrical information as indicated on the documents. TIME OF COMPLETION. Time is of the essence. Task Order award will be made on August 4th, 2026. The Notice to Proceed will be issued shortly thereafter. The Work shall be Substantially Complete no later than one hundred eighty (180) calendar days from the date of the Notice to Proceed. Final Completion shall be fourteen (14) calendar days following Substantial Completion.

GC Bidding

Educational

$1,000,000.00

Public - County

Demolition, Renovation

23

17

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
89
Bidding Soon
1,597
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

July 20, 2026

Project location map

1001 SE 12th St, Gainesville, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed