Site work and new construction of an educational facility in Culver City, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
PROJECT IDENTIFICATION: A. The undersigned, is familiar with the terms of the Contract, the local conditions affecting performance of Contract, the cost of the Work at the place where the Work is to be done, and with the Drawings, Specifications and all other Bidding Documents. The undersigned hereby proposes and agrees to perform, within the Contract Time stipulated, the Work including all of its component parts; and to provide and furnish any and all of the labor, materials, tools, apparatus, facilities, expendable equipment, and all utility and transportation services necessary to perform the Work in accordance with the Contract and complete all Work in a workmanlike manner for: Playa Del Rey Elementary School, Roofing (PSA), 10377120 in strict conformity with the Drawings and Specifications prepared by: Facilities Services Division Los Angeles Unified School District The furnishing of all labor, materials, equipment, services, and incidentals necessary for Work of the Roofing, at Playa Del Rey Elementary School located at 12221 Juliette St., Los Angeles, California 90230, A. Remove and Replace Deteriorated Roofing. o The scope of work will involve the complete removal of the existing roofs on all the buildings noted in Section D of the appendix, and, replacing them with new PVC membrane sheet roofing material with DensDeck(R) insulation. This will also include the removal and replacement of the roofing along the edge metal flashing where present. o CONTRACTOR shall provide, install, and maintain temporary fencing at all stages of the Work to secure all buildings, work areas, and any adjacent zones affected by construction activities. All temporary fencing shall be secured using BigFoot ballast or an approved equal. o CONTRACTOR shall prepare and submit drawings indicating the location, layout, and extent of all temporary fencing and associated access controls. These drawings shall be included with the Contractor's weekly look-ahead schedule submittal provided to the Owner and School staff for review and coordination. B. Materials to potentially be impacted included but not limited to: o All roofing materials, all roofing mastics and/or caulking. o Exterior metal flashings and edge metals. o Minor exterior stucco wall impacts with gutter and/or downspout removal and replacement. 1. building a-307 o remove approximately 1,053 sq ft rock roof install approximately 1,053 sq ft mechanically attached 1/4" dens board o install approximately 1,053 sq ft mechanically attached pvc roof system o install approximately 132 ln ft pvc clad edge metal kick & hem, double weld approximately 132 ln ft 8" pvc detail strip and 14 pvc cover plates at metal joints. o install approximately 5 pvc pipe flashings 2. building aa-383 o remove approximately 2,268 sq ft fiberglass reinforced asphalt shingles o remove approximately 16 ln ft deteriorated gutters o install approximately 2,268 sq ft roofing felt (as per specification division 07-3113) o install approximately 230 ln ft (2" x 2" corosion resistant 22ga edge metal, 1/2 " hem, interlocking) o install approximately 2,268 sq ft fiberglass reinforced asphalt shingles system (as per specification division 07-3113) o install approximately 79 ln ft fiberglass reinforce ridge o install approximately 4 new galvanized jack flashing o install approximately 16 ln ft new stainless steel gutter 3. building aa-384 o remove approximately 2,268 sq ft fiberglass reinforced asphalt shingles o remove approximately 16 ln ft deteriorated gutters o install approximately 2,268 sq ft roofing felt (as per specification division 07-3113) o install approximately 230 ln ft (2" x 2" corosion resistant 22ga edge metal, 1/2 " hem, interlocking) o install approximately 2,268 sq ft fiberglass reinforced asphalt shingles system (as per specification division 07-3113) o install approximately 79 ln ft fiberglass reinforce ridge o install approximately 4 new galvanized jack flashing o install approximately 16 ln ft new stainless steel gutter 4. arcade o remove approximately 9,930 sq ft bur capsheet roofing' remove approximately 871 ln ft deteriorated gutters o remove approximately 704 ln ft counter flashing o remove approximately 119 old durabloks o install approximately 9,930 sq ft mechanically attached 1/4" dens board o install approximately 9,930 sq ft mechanically attached pvc roof system o install approximately 1,162 ln ft pvc clad edge metal kick & hem, double weld approximately 1,162 ln ft 8" pvc detail strip and 117 pvc cover plates at metal joints. o install approximately 871 ln ft new gutters o install approximately 704 ln ft base flashing o install approximately 704 ln ft counter flashing o install approximately 3 new splash pans o install approximately 119 new durabloks 5. building b o remove approximately 6,290 sq ft bur capsheet roofing o remove approximately 210 deteriorated gutters o remove approximately 252 deteriorated coping metal o remove approximately 158 ln ft counter flashing o remove approximately 8 double stanchions o remove approximately 48 deteriorated durabloks o recondition approximately 4 jolsum drains o install approximately 6,290 sq ft mechanically attached 1/4" dens board o install approximately 6,290 sq ft mechanically attached pvc roof system o install approximately 274 ln ft pvc clad edge metal kick & hem, double weld approximately 274 ln ft 8" pvc detail strip and 28 pvc cover plates at metal joints. o install approximately 210 new stainless steel gutters o install approximately 4 pvc scuppers o install approximately 292 ln ft base flashing o install approximately 158 ln ft counter flashing o install approximately 8 new double stanchions o install approximately 26 pvc pipe flashings o install approximately 150 ln ft pvc walkway tread o install approximately 48 new durablock rubber conduit supports 6. building c o remove approximately 2,310 sq ft bur capsheet roofing o install approximately 2,310 sq ft mechanically attached 1/4" dens board o install approximately 2,310 sq ft mechanically attached pvc roof system o install approximately 202 ln ft pvc clad edge metal kick & hem, double weld approximately 202 ln ft 8" pvc detail strip and 21 pvc cover plates at metal joints. o install approximately 4 pvc pipe boot flashings 7. building d o remove approximately 2,310 sq ft bur capsheet roofing o install approximately 2,310 sq ft mechanically attached 1/4" dens board o install approximately 2,310 sq ft mechanically attached pvc roof system o install approximately 202 ln ft pvc clad edge metal kick & hem, double weld approximately 202 ln ft 8" pvc detail strip and 21 pvc cover plates at metal joints. o install approximately 10 pvc pipe boot flashings 8. building f o remove approximately 2,310 sq ft bur capsheet roofing o install approximately 2,310 sq ft mechanically attached 1/4" dens board o install approximately 2,310 sq ft mechanically attached pvc roof system o install approximately 202 ln ft pvc clad edge metal kick & hem, double weld approximately 202 ln ft 8" pvc detail strip and 21 pvc cover plates at metal joints. o install approximately 8 pvc pipe boot flashings 9. building g o remove approximately 2,310 sq ft bur capsheet roofing o install approximately 2,310 sq ft mechanically attached 1/4" dens board o install approximately 2,310 sq ft mechanically attached pvc roof system o install approximately 202 ln ft pvc clad edge metal kick & hem, double weld approximately 202 ln ft 8" pvc detail strip and 21 pvc cover plates at metal joints. o install approximately 4 pvc pipe boot flashings 10. building h o remove approximately 2,660 sq ft bur capsheet roofing o install approximately 2,660 sq ft mechanically attached 1/4" dens board o install approximately 2,310 sq ft mechanically attached pvc roof system o install approximately 222 ln ft pvc clad edge metal kick & hem, double weld approximately 222 ln ft 8" pvc detail strip and 23 pvc cover plates at metal joints. o install approximately 11 pvc pipe boot flashings 11. kindergarten o remove approximately 2,590 sq ft bur capsheet roofing o install approximately 2,590 sq ft mechanically attached 1/4" dens board o install approximately 2,590 sq ft mechanically attached pvc roof system o install approximately 218 ln ft pvc clad edge metal kick & hem, double weld approximately 218 ln ft 8" pvc detail strip and 22 pvc cover plates at metal joints. o install approximately 6 pvc pipe boot flashings 12. lunch pavilion o remove approximately 1,769 sq ft bur capsheet roofing o remove approximately 89 ln ft counter flashing o remove approximately 62 ln ft deteriorated gutters o install approximately 1,769 sq ft mechanically attached 1/4" dens board o install approximately 1,769 sq ft mechanically attached pvc roof system
GC Bidding
Educational
$1,008,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2026
August 17, 2026
12221 Juniette St, Culver City, CA
Related To This Project
Culver City, CA
--
Culver City, CA
--
Culver City, CA
--
Culver City, CA
Bid Date: Jul 09 2026
Culver City, CA
Bid Date: Jun 04 2026
Culver City, CA
Bid Date: May 21 2026
Culver City, CA
Bid Date: Apr 23 2026
Culver City, CA
Bid Date: May 21 2026
Culver City, CA
Bid Date: May 14 2026
Culver City, CA
Bid Date: May 07 2026
Culver City, CA
Bid Date: May 28 2026
Culver City, CA
--
Culver City, CA
Bid Date: Mar 10 2026
Culver City, CA
Bid Date: Mar 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.