Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 29, 2026 at 8:00 PM
Updated June 10, 2026
Site work for a water / sewer project in Gulf Shores, Alabama. Completed plans call for site work for a water / sewer project.
The project will consist of the construction of a concrete pad/pit for vacuum truck dumping. The project will be located at the Gulf Shores wastewater treatment facility. Bidders shall submit pre-qualification statement a minimum of 10 days prior to the bid opening. The prequalification statement shall include the contractor's full legal name, contractor's licenses, address, and a minimum of 3 references for similar projects completed within the last 5 years. Passing the prequalification stage is a mandatory prerequisite for receiving the full bid package and having the final bid considered. All bids must be on the bid forms provided in the Bid Documents. Bids shall be accompanied by a Bid Security equal to 5% of the bid price, but in no event more than $10,000.00. Bid Security shall be in the form of a Bid Bond or a cashier's check payable to The Gulf Shores Utilities Board. No Bid Security is required on bids less than $10,000.00. All bids, with their guarantee (when required), must be enclosed in a sealed envelope, clearly identified on the outside as "Sealed Bid" with Project Name, Gulf Shores Utilities' Name and Address, Bidder's Name and Address, Bidder's State of Alabama Contractor's License Number, and date of the bid opening. Each bid must be in a separate envelope. Bids made out in pencil will not be accepted. It shall be the responsibility of the contractor to assure receipt of the bid at the Gulf Shores Utilities Board's Office prior to the published time for the bid opening. Failure to observe the instructions contained herein will constitute grounds for rejection of your bid. Gulf Shores Utilities Board reserves the right to accept or reject all bids or any portion thereof whichever is in the best interest of the Board. Pre-qualification requirements: The prequalification statement shall include the contractor's full legal name, contractor's licenses, address, and a minimum of 3 references for similar projects completed within the last 5 years. Passing the prequalification stage is a mandatory prerequisite for receiving the full bid package and having the final bid considered.
GC Bidding
Water / Sewer
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2026
July 26, 2026
1629 East 1st Street, Gulf Shores, AL
Related To This Project
Gulf Shores, AL
--
Gulf Shores, AL
--
Gulf Shores, AL
--
Gulf Shores, AL
--
Gulf Shores, AL
--
Gulf Shores, AL
Bid Date: Jul 30 2026
Gulf Shores, AL
Bid Date: Jun 04 2026
Gulf Shores, AL
Bid Date: Jun 02 2026
Gulf Shores, AL
Bid Date: Apr 28 2026
Gulf Shores, AL
--
Gulf Shores, AL
--
Gulf Shores, AL
Bid Date: May 14 2026
Gulf Shores, AL
Bid Date: Apr 16 2026
Gulf Shores, AL
--
Gulf Shores, AL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
