Demolition, site work, renovation and addition to a power facility in Lake Buena Vista, Florida. Completed plans call for the addition of a power facility; for the demolition of a power facility; for the renovation of a power facility; and for site work for a power facility.
This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements. The scope includes: A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls; B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls; C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project; D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls; E. All electrical systems supporting the above items as well as lighting and lightning protection at new cooling tower and pump area; F. New make-up water and overflow drain systems at new cooling tower; G. New fire protection system for new cooling tower—this shall be a separate, alarmed branch from the existing dry valve system; H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed; I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline; J. Waterproofing of new cooling tower basin. Liquidated damages apply for delay, and the basis of award is the low bidder of the total of all line items. Communication with District staff and officials is strictly prohibited during the active bid process, except as allowed for procurement inquiries or protest policy. Required forms and bonding must be included in submissions. Question Deadline 06/19/2026 at 6:00 PM ET Online Q&A Yes Liquidated Damages : $2,667 per day delay past Substantial Completion
GC Bidding
Power Plant
$300,000.00
Public - County
Addition, Demolition, Renovation, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2026
August 1, 2026
397 Cypress Drive, Lake Buena Vista, FL
Related To This Project
Lake Buena Vista, FL
Bid Date: Jun 17 2026
Lake Buena Vista, FL
Bid Date: Jun 18 2026
Lake Buena Vista, FL
Bid Date: Jun 11 2026
Lake Buena Vista, FL
Bid Date: Jun 18 2026
Lake Buena Vista, FL
Bid Date: Apr 30 2026
Lake Buena Vista, FL
Bid Date: May 06 2026
Lake Buena Vista, FL
Bid Date: Jun 03 2026
Lake Buena Vista, FL
Bid Date: May 26 2026
Lake Buena Vista, FL
Bid Date: May 04 2026
Lake Buena Vista, FL
Bid Date: Apr 21 2026
Lake Buena Vista, FL
Bid Date: Mar 25 2026
Lake Buena Vista, FL
Bid Date: Apr 17 2026
Lake Buena Vista, FL
--
Lake Buena Vista, FL
Bid Date: Mar 19 2026
Lake Buena Vista, FL
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.