Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 12, 2026 at 8:00 PM
Updated June 13, 2026
This is a service / maintenance or supply contract in Birmingham, Alabama. Contact the soliciting agency for additional information.
Cancellation Description This requirement 6913G626Q300029 is canceled. The current intnent offthe Government is to reissue this requirement with a revised Statement of Work in the near future. The work consists of providing remedial action support to the Federal Aviation Administration Facilities Environmental Cleanup Program at three facilities in the FAA Eastern Service Area where soil contamination has been identified. The effort includes the removal, disposal, and restoration of lead- and total petroleum hydrocarbon-contaminated soils based on findings from prior Preliminary Assessments, Site Investigations, and Site Survey activities completed in 2024. The FAA has determined that these sites present potential environmental and human health risks and/or liability due to historical operations and practices, requiring cleanup actions to address contamination above FAA action levels or applicable EPA or state regulatory limits. The contractor shall perform all activities in compliance with applicable federal, state, and local regulations, following the most stringent requirement where inconsistencies exist. A draft Remediation and Restoration Work Plan shall be prepared and submitted within ten business days of the project kick-off meeting. The Work Plan shall present the technical approach, methods, and schedule for conducting contaminated soil remediation, removal, disposal, and site restoration activities. Government-furnished information, including available assessment and investigation reports, shall be reviewed and used to inform removal depths and quantities. The Work Plan shall fully describe soil handling and disposal procedures, identify all disposal facilities to be used, and address all required waste sampling, documentation, and permitting. Disposal sampling and paperwork are the responsibility of the contractor, while all confirmatory sampling will be performed by the government. The Work Plan shall also include a Site Safety and Health Plan detailing personnel health and safety precautions, and a Risk Management Plan identifying major site-specific risks and hazards and measures to minimize those risks. The contractor shall identify all required work permits and incorporate procedures for safe and compliant execution of the remediation. Following submission of the draft Work Plan, the Volpe Center will conduct a review and provide comments. The contractor shall participate in discussions to resolve comments and submit a final Work Plan incorporating required revisions within the specified review period. Contaminated soil remediation activities shall address soils with lead concentrations exceeding the FAA cleanup standard of 200 milligrams per kilogram or applicable state standards, as well as soils with total petroleum hydrocarbons exceeding EPA or state regulatory limits. All remediation, disposal, and restoration work shall be completed in accordance with the approved final Work Plan and applicable regulatory requirements.
Final Planning
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2026
December 14, 2026
Multiple Locations, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Jun 03 2026
Birmingham, AL
Bid Date: Jun 25 2026
Birmingham, AL
Bid Date: Jun 16 2026
Birmingham, AL
--
Birmingham, AL
--
Birmingham, AL
Bid Date: Jun 16 2026
Birmingham, AL
Bid Date: Jul 02 2026
Birmingham, AL
Bid Date: Jun 25 2026
Birmingham, AL
--
Birmingham, AL
--
Birmingham, AL
Bid Date: Apr 28 2026
Birmingham, AL
--
Birmingham, AL
--
Birmingham, AL
--
Birmingham, AL
Bid Date: Apr 17 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed