BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2026 at 8:00 PM

Updated May 30, 2026

Site work for a water / sewer project in Sentinel, Oklahoma. Completed plans call for site work for a water / sewer project.

Each Proposal shall be accompanied by an acceptable form of Proposal Guaranty in an amount equal to at least 5% of the amount of the Proposal payable to the Town of Sentinel as a guaranty that if the Proposal is accepted, the BIDDER will execute the Contract and file acceptable Performance and Statutory Bonds within 10 days after the award of the Contract. The Town of Sentinel hereinafter called the OWNER, reserves the right to reject any or all Proposals and to waive any formality or technicality in any Proposal in the interest of the OWNER. Each Proposal shall be accompanied by a Certified Check or Bid Bond, in an amount equal to 5% of the Proposal, payable without condition to the OWNER as a guaranty that the BIDDER, if awarded the Contract, will promptly execute the Agreement in accordance with the Proposal and the other Contract Documents, and will furnish good and sufficient Bond for the faithful performance of the same, and for the payment to all persons supplying labor and material for the work. The Proposal Guaranties of all BIDDERS except the three lowest will be returned promptly after the canvass of Proposals. Bid Bonds shall be secured from a Surety Company listed in the Federal Registry, Department of the Treasury, Fiscal Service Listing. The successful BIDDER, simultaneously with the execution of the Contract, will be required to furnish a faithful Performance Bond in an amount equal to 100% of the Contract Amount and a Statutory Bond made payable to CLIENT equal to 100% of the Contract Amount; said Bonds shall be secured from a Surety Company listed in the Federal Registry, Department of the Treasurer, Fiscal Service Listing. Liquidated damages for failure to complete the work within the time specified shall be assessed at the rate of $250 per day for each additional calendar day until the work is completed. The CONTRACTOR shall provide a 1-year Maintenance Bond for all improvements in the amount of 100% of the Contract Cost of improvements. If awarded the Contract, the UNDERSIGNED agrees to complete the work within 120 calendar days of the commencement of the Contract Time as defined in the General Conditions of the Contract.

GC Bidding

Water / Sewer

$150,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
21
Bidding Soon
250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

July 6, 2026

Project location map

Multiple Locations, Sentinel, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.